Integrated Five-Year Work Plan

FISCAL Year 2021-2025 

Adopted september 23, 2020

Contents

The Integrated Five-Year Work plan. 5

Introduction. 5

Focused Investment 5

Implementing the Strategic Plan. 5

A Balanced Transportation System.. 6

Introduction. 6

Did You Know.. 6

ACHD’s Complete Streets Guiding Principle. 6

ACHD Serves You When You Drive. 6

Did You Know.. 6

Priority Corridor Completion. 6

Building Out Your Major Roads. 7

Managing the Congestion You Face. 7

Project Programming. 7

ACHD Serves You When You Bike. 7

Did You Know.. 7

Building a Bikeway Network. 7

Building the Right Bike Facilities for You. 7

Increasing Access with a Low-Stress Network. 8

ACHD Serves You When You Walk. 8

Did You Know.. 8

ACHD is Committed to Safe Routes to School…and Everywhere Else. 8

Building Sidewalks Where You Want Them.. 8

Filling Key Gaps in the Sidewalk Network. 8

Improving Your Access to Where You Want to Go. 9

ACHD Serves All People. 9

Did You Know.. 9

Safe Sidewalks Are Accessible To All 9

Improving Pedestrian Ramp Accessibility. 9

Improving Sidewalk Accessibility. 9

Providing Accessible Pedestrian Signals. 10

Neighborhood Investments Where You Live. 10

Did You Know.. 10

Barber Valley. 10

Proposed Projects. 10

Boise Central Bench. 10

Proposed Projects. 11

Boise Downtown. 11

Proposed Projects. 11

Boise East End. 12

Proposed Projects. 12

Boise North. 12

Proposed Projects. 13

Boise Northwest 14

Proposed Projects. 14

Boise Southeast 14

Proposed Projects. 14

Boise Southwest 15

Proposed Projects. 15

Boise West Bench. 16

Proposed Projects. 16

Eagle. 17

Proposed Projects. 17

Garden City. 18

Proposed Projects. 18

Kuna. 18

Proposed Projects. 18

Meridian Downtown. 19

Proposed Projects. 19

Meridian North. 20

Proposed Projects. 20

Meridian South. 21

Proposed Projects. 21

Star. 22

Proposed Projects. 22

External Funding Plan. 22

Introduction. 22

Federal Capital Improvements. 23

Additional Capital Improvement and Safety Needs. 23

Bicycle and Pedestrian Safety Project Needs. 26

Proactively Address Environmental Regulations. 27

Enhancement Projects. 29

Bridges Program.. 32

Major Bridges. 32

Minor Bridges. 34

Capital Investment Program.. 56

Cooperative. 56

Intersections. 67

Roads. 83

Capital Maintenance Program.. 103

Federal Projects. 103

Local Projects. 114

Community Programs. 131

Bikeways. 131

Core Community Projects. 140

Economic Development 160

Safe Sidewalks. 162

Vehicle Registration Fee Projects. 165

Environmental Program.. 184

Traffic Safety and Operations Program.. 188

Operations and Maintenance. 188

Safety and Accessibility. 192

 

 


 

The Integrated Five-Year Work plan

ACHD’s Vision – Leading Transportation Innovation – Investing in Communities

Introduction

The 2021-2025 Integrated Five-Year Work Program (IFYWP) sets forth the strategies, projects and priorities which the Ada County Highway District (ACHD) will pursue over the next five years.  The first two years of the Plan align with ACHD’s 2021 Budget, adopted on August 26, 2020. The remaining years set the focus for ACHD’s efforts for future budget years. The document allows elected officials, staff, partner agencies, and the public to work in a coordinated fashion to implement projects.

The Integrated Five-Year Work Plan works in support of various ACHD and partner agency foundational planning documents and is the implementing arm for these plans. The process starts with City and County Comprehensive Plans as they establish the land use vision for the county. These are integrated in the region’s long-range transportation plan, Communities in Motion 2.0. This plan uses the land use vision to create 20-year demographic and travel demand projections. ACHD used this plan in creating its Strategic Plan, which set forth an asset management and resource allocation strategy. The Strategic Plan influences all of ACHD’s major planning documents. These documents, including the Americans with Disabilities Act Transition Plan, Bike Master Plan, Neighborhood Plans, Capital Improvement Plan, and asset management plans, work with the public to identify projects and develop an implementation strategy. These strategies are brought into ACHD’s Integrated Five-Year Work Plan and Budget.

Focused Investment

Implementing the Strategic Plan

ACHD established its vision, mission, and priorities in 2011, with the intent of ensuring that all ACHD activities are focused on the best interest of the citizens we serve. The bottom line is that every choice ACHD makes must help to effectively and efficiently accomplish ACHD’s Vision, Mission and Priorities.

In June 2016, the ACHD Commission adopted a Strategic Plan to further clarify the intent of its vision, mission, and priorities. The Plan included a resource allocation methodology that informs and guides development of the IFYWP. That methodology, further revised in 2019, guides the programming and project selection decisions for the IFYWP.

1.       MEET ACHD’S PROGRAMMING OBLIGATIONS

a.       Ensure compliance with applicable federal laws (Americans with Disabilities Act & Environmental Regulations)

b.       2008 Vehicle Registration Fee commitments – Safe routes to school & congestion relief

c.        Match Impact Fee collections with required general funds

2.       PRIMARY FOCUS – SAFETY & MAINTENANCE

a.       Signals, Crossings, and Safety Projects with documented needs

b.       Asset Management – Capital Maintenance & Bridges (Minor & Major if reserves available)

3.       SECONDARY FOCUS – SYSTEM ENHANCEMENTS

a.       Neighborhood Plan & Bike Master Plan projects not funded by VRF

b.       Non-Impact Fee Eligible Capital Improvement Plan Projects

A Balanced Transportation System

Introduction

In determining the scope of each project listed within the IFYWP, ACHD seeks to implement its Complete Streets Policy and meet the needs of all users within the project limits in order to take the most advantage of work going on in an area. In January 2020, ACHD released its first IFYWP Annual Report. This report accounts for the progress being made in building a complete transportation network for all users in the County. The 2020 report can be found at https://bit.ly/38i5VJD. Metrics shown in this IFYWP are updated to reflect progress that will be made through this draft IFYWP.

Did You Know

ACHD has plans to continue to ensure safe and accessible movement of all people in Ada County.

-         PEOPLE WHO DRIVE

o    Capital Improvement Plan

-         PEOPLE WHO WALK

o    Neighborhood Plans

-         PEOPLE WHO BIKE

o    Bike Master Plan

-         PEOPLE OF ALL ABILITIES

o    ACHD ADA Transition Plan

-         PEOPLE WHO TRAVEL TOGETHER

o    Capital Improvement Plan

o    Community Programs

ACHD’s Complete Streets Guiding Principle

Streets, bridges and transit stops within Ada County should be designed, constructed, operated and maintained so that pedestrians, bicyclists, transit riders, motorists, and people of all ages and abilities can travel safely and independently.  (ACHD Policy Manual Section 3110.2)

ACHD Serves You When You Drive

Did You Know

ACHD’s Master Street Map shows the how many lanes every arterial in the county will have when fully built out. To learn more visit https://bit.ly/2RSeNzl.

Priority Corridor Completion

In an effort to implement the CIP in a logical manner, the ACHD Commission has adopted a series of priority corridors. In 2020, ACHD will have completed 3 priority corridors.

-         Cloverdale, Overland / Chinden

-         Franklin, Black Cat / Cole

-         Ten Mile, Overland / Chinden

Building Out Your Major Roads

-         31% Complete Total Planned Lane Miles – A 1% increase from Annual Report

-         9% Programmed Total Planned Lane Miles – A 3% increase from Annual Report

Managing the Congestion You Face

-         29 Programmed IFYWP Projects to Address Congested Locations – A 8 project increase from Annual Report

-         17 Unfunded Projects Needed to Address Congested Locations Due to Lack of Funding – A 4 project decrease from Annual Report

Project Programming

-         23 Projects Completed or Under Construction in Fiscal Year 2020.

-         29 New Projects in the 2021-2025 IFYWP

ACHD Serves You When You Bike

Did You Know

About 7.5% of the cost of road and intersection widening projects is spent on designing, buying right-of-way, and constructing bike facilities. That equals over $16 million in investment between 2021-2025.

Building a Bikeway Network

This IFYWP includes the addition of $1 million in dedicated Bikeway Signage projects. This, in addition to the named bikeway projects and those that will be completed with other capital projects, will complete 54 bikeway projects and 90.5 miles of connected bikeway facilities.

Building the Right Bike Facilities for You

-         Level 3 Bike Facilities

o    30 Built Miles (2 More Than Annual Report)

o    29 Programmed Miles (13 More Than Annual Report)

o    180 Future Miles

-         Level 2 Bike Facilities

o    143 Built Miles (5 More Than Annual Report)

o    11 Programmed Miles

o    175 Future Miles

-         Level 1 Bike Facilities

o    239 Built Miles (1 More Than Annual Report)

o    147 Future Miles

Increasing Access with a Low-Stress Network

-         6% Complete Miles of Low-Stress Bikeway Network – Includes added Shoshone Bikeway

-         27% Programmed Miles of Low-Stress Bikeway Network – 8% increase from Annual Report

-         9% of Population Within ¼ Mile of a Complete Low-Stress Bikeway

-         40% of Population Within ¼ Mile of a Complete or Programmed Low-Stress Bikeway

-         23 New or Enhanced Crossings Built in 2020

ACHD Serves You When You Walk

Did You Know

Community Programs is what ACHD calls pedestrian and bike projects. The draft IFYWP includes $52 million for these projects for 2021-2025, over and above the sidewalks, crossings, and other improvements made with road and intersection projects.

ACHD is Committed to Safe Routes to School…and Everywhere Else

Since the voters approved a vehicle registration fee increase in 2008 with the promise a portion of those funds would go to safe routes to schools, ACHD has built 136 projects improving safety for children who walk to school. ACHD is keeping its commitment to the voters. But these are not the only projects ACHD has built to support pedestrian safety. In that same time, ACHD has actually completed a total of 254 Community Programs projects.

Building Sidewalks Where You Want Them

-         Arterials

o    176 Built Miles (6 More Than Annual Report)

o    27 Programmed Miles (6 More Than Annual Report)

o    180 Future Miles

-         Collectors

o    157 Built Miles (1 More Than Annual Report)

o    10 Programmed Miles (1 More Than Annual Report)

o    102 Future Miles

-         Locals

o    1,169 Built Miles

o    3 Programmed Miles

o    16 Future Miles

Filling Key Gaps in the Sidewalk Network

-          7 Miles of Completed Gaps (7 More Than Annual Report)

-          26 Miles of Program Gaps (3 More Than Annual Report)

-          77 Total Miles of Gaps

Improving Your Access to Where You Want to Go

-          Population Within A 1 Mile Walk of Key Destinations

o    Schools – 56% of the Population (1% More Than Annual Report)

o    Parks – 47% of the Population

o    Bus Stops – 35% of the Population

o    Grocery Stores – 36.5% of the Population (0.5% More Than Annual Report

ACHD Serves All People

Did You Know

The ACHD Commission has directed ACHD Staff to complete an inventory of diagonal curb ramps and pedestrian push buttons to review their level of accessibility. This project is underway and will be completed in October 2020.

Safe Sidewalks Are Accessible To All

ACHD’s Safe Sidewalk Program dedicates $1.6 million per year to improve the accessibility of existing sidewalks throughout Ada County. This program also fills minor sidewalk gaps where possible. Locations for improvements have been identified through ACHD’s Americans with Disabilities Act Transition Plan or through input from the public. If you see a sidewalk in disrepair or something is making your travel inaccessible, ACHD wants to know about it. Contact us here.

Improving Pedestrian Ramp Accessibility

-          High Priority Locations

o    Identified – 1,273 Curb Ramps

o    Complete – 171 Curb Ramps (94 More Than Annual Report)

o    Programmed – 257 Curb Ramps (4 More Than Annual Report)

o    Future – 845 Curb Ramps (98 Less Than Annual Report)

-          Medium Priority Locations

o    Identified – 696 Curb Ramps

o    Complete – 88 Curb Ramps (47 More Than Annual Report)

o    Programmed – 59 Curb Ramps (11 Less Than Annual Report)

o    Future – 549 Curb Ramps (36 Less Than Annual Report)

-          Low Priority Locations

o    Identified – 7,608 Curb Ramps

o    Complete – 223 Curb Ramps (147 More Than Annual Report)

o    Programmed – 344 Curb Ramps (26 Less Than Annual Report)

o    Future – 7,041 Curb Ramps (121 Less Than Annual Report)

Improving Sidewalk Accessibility

-          High Priority Locations

o    Identified – 58.6 Miles of Sidewalk

o    Complete – 0.4 Miles of Sidewalk (0.1 More Than Annual Report)

o    Programmed – 4.9 Miles of Sidewalk (1.5 More Than Annual Report)

o    Future – 53.2 Miles of Sidewalk (1.7 Less Than Annual Report)

-          Medium Priority Locations

o    Identified – 224.8 Miles of Sidewalk

o    Complete – 5.1 Miles of Sidewalk (2.4 More Than Annual Report)

o    Programmed – 10.2 Miles of Sidewalk (1.2 More Than Annual Report)

o    Future – 209.5 Miles of Sidewalk (3.6 Less Than Annual Report)

-          Low Priority Locations

o    Identified – 766.6 Miles of Sidewalk

o    Complete – 2.9 Miles of Sidewalk (1.2 More Than Annual Report)

o    Programmed – 14.4 Miles of Sidewalk (2.2 More Than Annual Report)

o    Future – 749.3 Miles of Sidewalk (3.4 Less Than Annual Report)

Providing Accessible Pedestrian Signals

-          163 Completed Intersections with Accessible Pedestrian Signals (25 More Than Annual Report)

-          62 Programmed Intersections with Accessible Pedestrian Signals (48 More Than Annual Report)

Neighborhood Investments Where You Live

Did You Know

ACHD has 16 neighborhood planning areas. While ACHD’s Neighborhood Plans look primarily at bike and pedestrian projects, these areas provide opportunity to look at the transportation system at a smaller scale for all modes.

-          290 Complete Neighborhood Plan Projects

-          150 Programmed Neighborhood Plan Projects

-          912 Total Identified Neighborhood Plan Projects

Barber Valley

Future Planning Area – Plan Proposed for 2022

Proposed Projects

-          Cul-de-Sac Reconstruct (2024) - HB312 Project – Maintenance Project (2024 Construction)

-          Cul-de-Sac Repair (2024) - HB312 Project – Maintenance Project (2024 Construction)

-          Federal Aid Capital Maintenance (2021) - Phase 2 – Maintenance Project (2021 Construction)

o    Warm Springs Ave, Starcrest Dr / Starview Dr

o    Warm Springs Ave, Glacier Dr / SH 21

-          Maintenance Crack Seal (2022) - HB312 Project – Maintenance Project (2022 Construction)

Boise Central Bench

Plan Adopted in 2012 – Next Update in 2022

Proposed Projects

-          Annett St, Malad St / Targee St – Community Project (Future Construction)

-          Bikeway Signage (2021) – Phase 1 – Community Project (2021 Construction)

o    Canal St Bikeway, Vista Ave / Federal Way

o    Columbus St Bikeway, Canal St / Kootenai St

o    Latah St Bikeway, Targee St / Emerald St

-          Cassia St Bikeway and Pedestrian Improvements – Community/Maintenance Project (2021 Construction)

-          Cul-de-Sac Reconstruct (2023) – Maintenance Project (2023 Construction)

-          Cul-de-Sac Repair (2023) – Maintenance Project (2023 Construction)

-          Federal Aid Capital Maintenance (2021) – Phase 1 – Maintenance Project (2021 Construction)

o    Curtis Rd, Targee St / Overland Rd

-          Garden St Bikeway, Albion St / Greenbelt – Community Project (2025 Construction)

-          Garden St, Bethel St / Emerald St – Community Project (2025 Construction)

-          Garden St, Franklin Rd / Bethel St – Community Project (2022 Construction)

-          Kootenai St Traffic Calming, Orchard St / Vista Ave – Community Project (2023-2024 Construction)

-          Liberty St Sidewalk and Bikeway, Douglas St / Denton St – Community Project (2023 Construction)

-          Maintenance Crack Seal (2021) – HB312 Project – Maintenance Project (2021 Construction)

-          Maintenance Crack Seal (2024) – HB312 Project – Maintenance Project (2024 Construction)

-          Nez Perce St Bikeway, Orchard St / Columbus St – Community Project (2023 Construction)

-          Orchard St and Franklin Rd Accessible Pedestrian Signal – Traffic Accessibility Project (2025 Construction)

-          Orchard St and Clark St – Traffic Safety Project (2024 Construction)

-          Overland Rd and Phillippi St Pedestrian Crossing – Community Project (2021 Construction)

-          Overland Rd and Vista Ave Intersection Maintenance and Safety Improvement – Maintenance/Traffic Safety Project (Future Construction)

-          Pavement Preservation & ADA (2022) - Phase 1 – Maintenance Project (2022 Construction)

-          Phillippi St Bridge #1366, 650' N/O Overland Rd – Bridge Project (2024 Construction)

-          Phillippi St, Overland Rd / Cassia St – Community Project (2025 Construction)

-          Phillippi St, Malad St / Targee St – Community Project (2021 Construction)

-          Phillippi St, Targee St / Overland Rd – Community Project (2021 Construction)

-          Roosevelt St, Rose Hill St / Emerald St – Community/Maintenance Project (2022 Construction)

-          Rose Hill St and Owyhee St Mini Roundabout – Traffic Safety Project (2024 Construction)

-          Shoshone St Bikeway, Canal St / Capital Blvd – Community Project (2020-2021 Construction)

-          Vista Ave and Nez Perce St Pedestrian Crossing – Community Project (2021 Construction)

Boise Downtown

Plan Adopted in 2013 – Next Update 2027

Proposed Projects

-          05th St and 06th St, Myrtle St / Fort St, Two-Way Conversion – Economic Development Project (Future Construction)

-          11th St Bridge #1493, 90’ N/O Main St – Bridge Project (Future Construction)

-          Bannock St Bikeway (West Phase), Whitewater Park Blvd / Ave C – Community Project (Future Construction)

-          Downtown Boise Implementation Plan (2019) – HB312 Project – Maintenance Project (2021 Construction)

o    08th St, Bannock St / State St (CCDC Project)

-          Downtown Boise Implementation Plan (2020) – HB312 Project – Maintenance Project (2021-2022 Construction)

o    09th St, University Ave / Front St

o    09th St, Bannock St / State St

o    10th St, Front St / Idaho St

o    Grove St, 16th St / 09th St

o    State St, 16th St / 01st St (2022 Construction)

o    State St and 12th St Pedestrian Crossing (2022 Construction)

o    State St and 13th Signal (2022 Construction)

o    State St and 14th St Pedestrian Crossing (2022 Construction)

-          Green Stormwater Implementation (2019) – Environmental Project (2020-2021 Construction)

-          Pavement Preservation & ADA (2022) – Phase 1 – Maintenance Project (2022 Construction)

o    09th St, Idaho St / Bannock St

Boise East End

Plan Adopted in 2017 – Next Update 2027

Proposed Projects

-          Bannock St Maintenance and Bikeway, Broadway Ave / Greenbelt - Community Project (2024 Construction)

-          Broadway Ave/Avenue B and Idaho St/Warm Springs Ave - Economic Development Project (Future Construction)

-          Coston St, Bannock St / Franklin St - Community Project (2023 Construction)

-          Cul-de-Sac Reconstruct (2024) - Maintenance Project (2024 Construction)

-          Cul-de-Sac Repair (2024) - Maintenance Project (2024 Construction)

-          Franklin St Bikeway, Resseguie St / Bannock St - Community Project (2025 Construction)

-          Franklin St, McKinley St / Pierce St - Community Project (2021 Construction)

-          Maintenance Crack Seal (2022) – HB312 Project - Maintenance Project (2022 Construction)

-          Pierce St, Washington St / Shenandoah Dr - Community Project (2020-2021 Construction)

-          Residential Capital Maintenance (2020) – HB312 Project - Maintenance Project (2020-2021 Construction)

o    Maple Ave, Warm Springs Ave / Franklin St

o    Pierce Pl, Shenandoah Dr / north end

-          St. Luke’s Master Plan Transportation Component Implementation - Cooperative Project (2021-2025)

-          Warm Springs Ave and Straughan Ave Pedestrian Crossing - Community Project (2023 Construction)

Boise North

Plan Adopted in 2016 – Next Update 2026

Proposed Projects

-          05th St and Fort St and Hays St - Economic Development Project (Future Construction)

-          09th St and Washington St Pedestrian Crossing - Community Project (2023 Construction)

-          11th St Maintenance and Bikeway, State St / Heron St - Community/ Maintenance Project (2022 Construction)

-          13th St Traffic Calming (Phase 1), Fort St / Hill Rd - Community Project (2021 Construction)

-          16th St Bridge #1484, 150’ N/O Washington St - Bridge Project (Future Construction)

-          24th St Road and Bridge Projects - Bridge Project (2022 Construction)

-          26th St Bridge #1321, 160’ S/O Hill Rd - Bridge Project (2023 Construction)

-          28th St, Hazel St / Irene St - Community Project (2020-2021 Construction)

-          32nd St Bridge #1308, 50’ S/O Hill Rd - Bridge Project (2021 Construction)

-          33rd St Bridge #1318, 20’ S/O Forsythia St - Bridge Project (2021 Construction)

-          38th St, Bush Ave / Sunset Ave - Community Project (2022 Construction)

-          Bannock St Bikeway (West Phase), Whitewater Park Blvd / Ave C - Community Project (Future Construction)

-          Bikeway Signage (2022) - Community Project (2022 Construction)

o    18th St Bikeway, Idaho St / Hill Rd

o    23rd St Bikeway, Fairview Ave / Breneman St

o    Breneman St Bikeway, 36th St / 18th St

o    Ellis-Resseguie Bikeway, 28th St / 08th St

o    Fairview-Main Bikeway, Garden St / 17th St

-          Cul-de-Sac Reconstruct (2024) – HB312 Project - Maintenance Project (2024 Construction)

-          Cul-de-Sac Repair (2024) – HB312 Project – Maintenance Project (2024 Construction)

-          Fairview Ave Bridge #2196 and #2197, Boise River - Bridge Project (Future Construction)

-          Franklin St Bikeway, Resseguie St / Bannock St - Community Project (2025 Construction)

-          Hazel St, 28th St / 26th St - Community Project (2020-2021 Construction)

-          Irene St, 32nd St / 28th St - Community Project (Future Construction)

-          Maintenance Crack Seal (2022) – HB312 Project - Maintenance Project (2022

-          Parkhill Dr Bridge #1383, 200’ W/O 15th St - Bridge Project (2025 Construction)

-          Pavement Preservation & ADA (2022) – Phase 1 - Maintenance Project (2022 Construction)

o    20th St, Lemp St / Irene St

o    26th St, State St / Heron St

-          Pavement Preservation & ADA (2022) – Phase 3 - Maintenance Project (2022 Construction)

o    Fort St, 16th St / 15th St

o    Resseguie St, 16th St / 08th St

-          Residential Capital Maintenance (2020) – HB312 Project - Maintenance Project (2020-2021 Construction)

o    10th St, Fort St / Heron St

o    Cunningham Pl, 08th St / 06th St

o    Heron St, Harrison Blvd / 13th St

o    O’Farrell St, 13th St / 04th St

-          State St, 36th St / 27th St - Roadway Project (Future Construction)

-          State St, Collister Dr / 36th St - Roadway Project (Future Construction)

-          Taft St, Sycamore Dr / 36th St - Community Project (Future Construction)

-          Whitewater Park Blvd Basin #1009 - Environmental Project (Future Construction)

Boise Northwest

Plan Adopted in 2015 – Next Update 2025

Proposed Projects

-          Bikeway Signage (2021) – Phase 2 - Community Project (2021 Construction)

o    Bloom St Bikeway, Greenbelt / Collister Dr

o    Northwest Boise Bikeway, Horseshoe Bend Rd / 36th St

-          Bogart Ln, SH 44 (State St) / Sloan St - Community Project (2021 Construction)

-          Carlsbad Way Bridge #1419, 500’ N/O State St - Bridge Project (2025 Construction)

-          Crewe Ave Bridge #1046, 300’ S/O Devonwood Dr - Bridge Project (Future Construction)

-          Cul-de-Sac Reconstruct (2024) – HB312 Project - Maintenance Project (2024 Construction)

-          Cul-de-Sac Repair (2024) – HB312 Project - Maintenance Project (2024 Construction)

-          Hill Rd, Castle Dr / Outlook Ave - Community Project (Future Construction)

-          Horseshoe Bend Rd, State St / Hill Rd - Community Project (2023 Construction)

-          Maintenance Crack Seal (2022) – HB312 Project - Maintenance Project (2022 Construction)

-          Pavement Preservation & ADA (2022) – Phase 1 - Maintenance Project (2022 Construction)

o    Bluegrass Ave, Ellens Ferry Dr / Castle Dr

o    Castle Hill Way / Drawbridge Dr

o    Drawbridge Dr, west end / Castle Hill Way

o    Turret Way, Castle Dr / Drawbridge Dr

-          Pavement Preservation & ADA (2022) – Phase 2

-          Collister Dr, Quail Ridge Dr / north end - Maintenance Project (2022 Construction)

-          Pierce Park Ln Bridge #2029, at Hill Rd - Bridge/Intersection Project (Future Construction)

-          Roe St, Limelight St / Caswell St - Community Project (Future Construction)

-          State St and Collister Dr (Carryover Costs) - Intersection Project (2019 Construction)

-          State St and Glenwood St - Intersection Project (Future Construction)

-          State St and Pierce Park Ln - Intersection Project (Future Construction)

-          State St, Collister Dr / 36th St - Roadway Project (Future Construction)

-          State St, Pierce Park Ln / Collister Dr - Roadway Project (Future Construction)

-          Taft St, Sycamore Dr / 36th St - Community Project (Future Construction)

Boise Southeast

Plan Adopted in 2014 – Next Update in 2024

Proposed Projects

-          Bikeway Signage (2022) - Community Project (2022 Construction)

o    Protest Hill Bikeway (Includes Lincoln & University), Vista Ave / Greenbelt

-          Bikeway Signage (2025) - Community Project (2022 Construction)

o    Manitou Bikeway, Broadway Ave / University Dr

-          Boise Ave and Linden St Pedestrian Crossing - Community Project (2023 Construction)

-          Bridge Preventative Maintenance (2021) - Bridge Project (2021 Construction)

o    Federal Way Bridge, E/O Bergeson St

-          Columbia Village Bikeway, SH 21 / Boise Ave - Community Project (2024 Construction)

-          Cul-de-Sac Reconstruct (2023) – HB312 Project - Maintenance Project (2023 Construction)

-          Cul-de-Sac Repair (2023) – HB312 Project - Maintenance Project (2023 Construction)

-          Division Ave, Highland St / Hale St - Community Project (2021 Construction)

-          Eckert Rd Bridge #2147 and #2148, Boise River / Ridenbaugh Canal - Bridge Project (Future Construction)

-          Federal Aid Capital Maintenance (2021) – Phase 1 - Maintenance Project (2021 Construction)

o    Boise Ave, Broadway Ave / Gekeler Ln

o    Linden St, Broadway Ave / Gekeler Ln

o    Surprise Way, Amity Rd / SH 21

-          Federal Aid Capital Maintenance (2021) – Phase 2 - Maintenance Project (2021 Construction)

o    Grand Forest Dr, Gowen Rd / Rockrose Way

o    Lake Forest Dr, Federal Way / Summersweet Dr

-          Maintenance Crack Seal (2021) – HB312 Project - Maintenance Project (2021 Construction)

-          Mallard Ave Bridge #1339, 650’ W/O Parkcenter Blvd - Bridge Project (2023 Construction)

Boise Southwest

Plan Adopted in 2018 – Next Update 2028

Proposed Projects

-          Amity Rd and Cloverdale Rd Roundabout - Intersection Project (2025 Construction)

-          Amity Rd and Five Mile Rd - Intersection Project (Future Construction)

-          Amity Rd and Maple Grove Rd - Intersection Project (2024-2025 Construction)

-          Arterial & Collector Capital Maintenance (2023) – HB312 Project - Maintenance Project (2023 Construction)

o    Maple Grove Rd, south end / Tarp Dr

-          Cloverdale Rd, Victory Rd / Overland Rd - Roadway Project (2025 Construction)

-          Cloverdale Rd, Amity Rd / Victory Rd - Roadway Project (2025 Construction)

-          Cloverdale Rd, Lake Hazel Rd / Amity Rd - Roadway Project (Future Construction)

-          Cole Rd and Victory Rd - Intersection Project (2020-2021 Construction)

-          Desert Ave, Latigo Dr / Round Up St - Community Project (2025 Construction)

-          Five Mile Rd and Seneca Dr Pedestrian Crossing - Community Project (2020-2021 Construction)

-          Five Mile Rd and Smoke Ranch Dr Pedestrian Crossing - Community Project (2021 Construction)

-          Five Mile Rd and La Grange St Pedestrian Crossing - Community Project (2022 Construction)

-          Five Mile Rd, Overland Rd / Franklin Rd - Roadway Project (Future Construction)

-          Five Mile Rd, Amity Rd / Victory Rd - Roadway Project (Future Construction)

-          Five Mile Rd, Lake Hazel Rd / Amity Rd - Roadway Project (Future Construction)

-          Hollandale-Targee Bikeway, Locust Grove Rd / Targee St - Community Project (2024 Construction)

-          Lake Hazel Rd and Cloverdale Rd - Intersection Project (2024 Construction)

-          Lake Hazel Rd and Five Mile Rd - Intersection Project (2025 Construction)

-          Lake Hazel Rd and Maple Grove Rd - Intersection Project (2023 Construction)

-          Lake Hazel Rd, Cloverdale Rd / Five Mile Rd - Roadway Project (2025 Construction)

-          Lake Hazel Rd, Eagle Rd / Cloverdale Rd - Roadway Project (2024 Construction)

-          Lake Hazel Rd, Five Mile Rd / Maple Grove Rd - Roadway Project (Future Construction)

-          Lake Hazel Rd, Maple Grove Rd / Cole Rd - Roadway Project (Future Construction)

-          Maintenance Crack Seal (2020) – HB312 Project - Maintenance Project (2020-2021 Construction)

-          Maintenance Crack Seal (2024) – HB312 Project - Maintenance Project (2024 Construction)

-          Maple Grove Rd, Victory Rd / Overland Rd - Roadway Project (2021 Construction)

-          Maple Grove Rd, Amity Rd / Victory Rd - Roadway Project (2024-2025 Construction)

-          Maple Grove Rd, Lake Hazel Rd / Amity Rd - Roadway Project (Future Construction)

-          Residential Capital Maintenance (2023) – HB312 Project - Maintenance Project (2023 Construction)

-          Reutzel Dr Bridge #1249, 165’ W/O Summerset Way - Bridge Project (2024 Construction)

-          Valley St, Lake Hazel Rd / La Grange St - Community Project (2020-2021 Construction)

-          Victory Rd and Five Mile Rd - Intersection Project (Future Construction)

-          Victory Rd, Cloverdale Rd / Five Mile Rd - Roadway Project (Future Construction)

-          Victory Rd, Eagle Rd / Cloverdale Rd - Roadway Project (Future Construction)

-          Victory Rd, Five Mile Rd / Maple Grove Rd - Roadway Project (Future Construction)

-          Victory Rd, Maple Grove Rd / Cole Rd - Roadway Project (Future Construction)

Boise West Bench

Plan Adopted in 2013 – Next Update 2023

Proposed Projects

-          Allumbaugh St, Fairview Ave / Northview St - Community Project (2024 Construction)

-          Benjamin Ln and BVRR Crossing Improvement - Traffic Safety Project (2022 Construction)

-          Bikeway Signage (2023) - Community Project (2023 Construction)

o    Chinden-McMillan Bikeway (Phase 1), Bennington Way / Mitchell St

o    Mitchell St Bikeway, Emerald St / Maple Grove Rd

-          Bikeway Signage (2024) - Community Project (2024 Construction)

o    Granger Ave Bikeway, Records Ave / Shamrock Ave

o    McMillan-Ustick Bikeway (Phase 1), Cloverdale Rd / Sawgrass Way

o    McMillan-Ustick Bikeway (Phase 2), Linwood Way / Cloverdale Rd

o    Records Way Bikeway, Pine Ave / Chinden Blvd

-          Bryson Ave Bridge #1134, 750’ N/O Fairview Ave - Bridge Project (2022 Construction)

-          Christine St, Northview St / Ustick Rd - Community Project (2023 Construction)

-          Clement St, Cabarton Ln / Mountain View Dr - Community Project (2025 Construction)

-          Cory Ln, Mitchell St / Maple Grove Rd - Community Project (2023 Construction)

-          Enhanced School Crossings – Meridian Middle School and Capital High School - Community Project (2021 Construction)

-          Fairview Ave and Curtis Rd Accessible Pedestrian Signal - Traffic Accessibility Project (2021 Construction)

-          Fairview Ave and Milwaukee St Accessible Pedestrian Signal - Traffic Accessibility Project (2021 Construction)

-          Fairview Ave and Orchard St - Traffic Accessibility Project (2022 Construction)

-          Federal Aid Capital Maintenance (2021) – Phase 1 - Maintenance Project (2021 Construction)

o    Curtis Rd, Fairview Ave / Ustick Rd

o    Fairview Ave, Maple Grove Rd / Milwaukee St

-          Federal Aid Capital Maintenance (2021) – Phase 2 - Maintenance Project (2021 Construction)

o    Edna St, Five Mile Rd / Mitchell St

-          Fiddler Dr Bridge #1510, 130’ W/O Arlen Dr - Bridge Project (2024 Construction)

-          Five Mile Rd, Overland Rd / Franklin Rd - Roadway Project (Future Construction)

-          Lena Ave Bridge #1509, 125’ N/O Hickory Dr - Bridge Project (2023 Construction)

-          Linda Vista Ln, Cory Ln / Ustick Rd - Community Project (Future Construction)

-          Maintenance Crack Seal (2024) – HB312 Project - Maintenance Project (2024 Construction)

-          Maple Grove Rd and Edna St Pedestrian Crossing - Community Project (2024 Construction)

-          McMillan Rd, Westview Dr / Maple Grove Rd - Community Project (2020-2021 Construction)

-          Milwaukee St, Marcum St / Ustick Rd - Community Project (2025 Construction)

-          Pavement Preservation & ADA (2022) – Phase 1 - Maintenance Project (2022 Construction)

o    Maple Grove Rd, I-84 / Franklin Rd

o    Wainwright Dr, Eagle Rd / Borrego Way

-          Poplar St Bikeway, Milwaukee St / Orchard St - Community Project (Future Construction)

-          Residential Capital Maintenance (2023) – HB312 Project - Maintenance Project (2023 Construction)

o    Cruser Dr, west end / Five Mile Rd

-          Safe Sidewalk Program (2021) - Community Project (2021 Construction)

-          Safe Sidewalk Program (2022) - Community Project (2022 Construction)

-          Shamrock Ave Bridge #1424, 0.1 miles N/O Fairview Ave - Bridge Project (2021 Construction)

-          Shoup Ave Bridge #1404, 0.25 miles W/O Maple Grove Rd - Bridge Project (2023 Construction)

-          Ustick-Northview Bikeway Connection, Shamrock Ave / Milwaukee St - Community Project (Future Construction)

-          Wildwood St Bridge #1425, 0.1 miles N/O Fairview Ave - Bridge Project (2024 Construction)

Eagle

Plan Adopted in 2019 – Next Update 2029

Proposed Projects

-          Aikens St, Eagle Rd / 02nd St - Economic Development Project (2023-2024 Construction)

-          Cul-de-Sac Reconstruct (2025) – HB312 Project - Maintenance Project (2025 Construction)

-          Cul-de-Sac Repair (2025) – HB312 Project - Maintenance Project (2025 Construction)

-          Eagle Rd and Ranch Dr Pedestrian Crossing – Community Project (Future Construction)

-          Eagle Rd and State - Intersection Project (2023 Construction)

-          Floating Feather Rd Bridge #1513, 0.1 miles E/O Palmer Ln - Bridge Project (2023 Construction)

-          Horseshoe Bend Rd and Floating Feather Rd - Community Project (2023 Construction)

-          Horseshoe Bend Rd and Shadowview St Pedestrian Crossing - Community Project (2020-2021 Construction)

-          Horseshoe Bend Rd, State St / Hill Rd - Community Project (2023 Construction)

-          Linder Rd and Floating Feather Rd Roundabout - Intersection Project (2024 Construction)

-          Linder Rd, Chinden Blvd (US 20/26) / SH 44 (State St) – South Phase - Roadway Project (Future Construction)

-          Linder Rd, SH 44 (State St) / Floating Feather Rd - Roadway Project (2024 Construction)

-          Linder-Meridian Bikeway, Pine Ave / Temple Dr - Community Project (2025 Construction)

-          Maintenance Crack Seal (2023) – HB312 Project - Maintenance Project (2023 Construction)

-          Palmer Ln Bridge #1009, N/O Floating Feather Rd - Bridge Project (2023 Construction)

-          US 20/26 (Chinden Blvd) and Locust Grove Rd - Intersection Project (2020-2021 Construction)

Garden City

Plan Adopted in 2020 – Next Update 2030

Proposed Projects

-          32nd St, US 20/26 (Chinden Blvd) / Clay St - Community Project (2023 Construction)

-          33rd St, US 20/26 (Chinden Blvd) / Greenbelt - Community Project (Future Construction)

-          35th St, US 20/26 (Chinden Blvd) / Greenbelt - Community Project (Future Construction)

-          37th St Bridge #1441, 350’ SW/O Adams St - Bridge Project (2025 Construction)

-          38th St Bridge #1440, 0.2 miles N/O Chinden Blvd - Bridge Project (2021 Construction)

-          41st St Bridge #1437, 600’ N/O Chinden Blvd - Bridge Project (2021 Construction)

-          44th St Bridge #1433, 0.1 miles N/O Chinden Blvd - Bridge Project (2021 Construction)

-          45th St Bridge #1432, 500’ N/O Chinden Blvd - Bridge Project (2022 Construction)

-          Bikeway Signage (2022) - Community Project (2022 Construction)

o    Orchard St Hill, Irving

-          Bikeway Signage (2025) - Community Project (2025 Construction)

o    43rd St Bikeway Connect, Ustick Rd / Greenbelt

-          Bridge Preventative Maintenance (2021) - Bridge Project (2024 Construction)

-          Clay St, 34th St / 32nd St - Community Project (2024 Construction)

-          Clay St, 37th St / 34th St; 34th St, Chinden Blvd / Clay St - Community Project (2025 Construction)

-          Maintenance Crack Seal (2024) – HB312 Project - Maintenance Project (2024 Construction)

-          State St and Glenwood St - Intersection Project (Future Construction)

-          State St and Pierce Park Ln - Intersection Project (Future Construction)

-          State St, Pierce Park Ln / Collister Dr - Roadway Project (Future Construction)

-          Thurman Mill Bridge Projects Water Quality Mitigation - Environmental Project (2022 Construction)

-          US 20/26 (Chinden Blvd) and 43rd St Pedestrian Crossing - Community Project (2023 Construction)

-          US 20/26 (Chinden Blvd) and Curtis Rd - Intersection Project (2021 Construction)

Kuna

Downtown Plan Adopted in 2012 – Full Plan in 2021

Proposed Projects

-          Arterial & Collector Capital Maintenance (2022) – HB312 Project - Maintenance Project (2022 Construction)

o    Avalon St, Swan Falls Rd / Orchard Ave

-          Avenue B, 02nd St / Main St - Community Project (Future Construction)

-          Avenue C, Main St / 04th St - Community Project (2022 Construction)

-          Avenue D, Main St / 04th St - Community Project (2024 Construction)

-          Black Cat Rd Bridge #1305, 0.21 miles N/O King Rd - Bridge Project (2025 Construction)

-          Columbia Rd Bridge #1283, 0.2 miles E/O Ten Mile Rd - Bridge Project (2024 Construction)

-          Deer Flat Rd and School Ave Pedestrian Crossing - Community Project (2020-2021 Construction)

-          Deer Flat Rd, School Ave / Deerhorn Ave - Community Project (2020-2021 Construction)

-          Kuna Middle School Zone, Ten Mile Ave and Boise St - Community Project (2022 Construction)

-          Linder Ave, Swan Falls Rd / 02nd St; Avalon St, Swan Falls Rd / Orchard St - Community Project (Future Construction)

-          Linder Rd and Deer Flat Rd - Intersection Project (2020-2021 Construction)

-          Linder Rd, Main St / Deer Flat Rd - Community Project (2024 Construction)

-          Maintenance Crack Seal (2020) – HB312 Project - Maintenance Project (2020-2021 Construction)

-          School Ave Bikeway, King Rd / Deer Flat Rd - Community Project (2025 Construction)

-          Ten Mile Rd and Columbia Rd - Intersection Project (Future Construction)

-          Ten Mile Rd and Hubbard Rd - Intersection Project (Future Construction)

-          Ten Mile Rd and Deer Flat Rd - Intersection Project (2024 Construction)

-          Ten Mile Rd and Lake Hazel Rd - Intersection Project (Future Construction)

Meridian Downtown

Plan Adopted in 2012 – Next Update 2023

Proposed Projects

-          Broadway Ave, West 08th St / West 04th St - Community Project (2025 Construction)

-          Cherry Ln and Meridian Library Pedestrian Crossing - Community Project (2020-2021 Construction)

-          Cul-de-Sac (2021) – HB312 Project - Maintenance Project (2021 Construction)

-          East 02 ½ St, Carlton Ave / Fairview Ave - Community Project (Future Construction)

-          East 03rd St, Franklin Rd / Carlton St - Community Project (2025 Construction)

-          Enhanced School Crossings – Meridian Middle School and Capital High School - Community Project (2021 Construction)

-          Federal Aid Capital Maintenance (2021) – Phase 3 - Maintenance Project (2021 Construction)

o    West 08th St, Pine Ave / Cherry Ln

-          Linder Rd, Franklin Rd / Pine Ave - Roadway Project (2020-2021 Construction)

-          Linder Rd, Overland Rd / Franklin Rd - Roadway Project (Future Construction)

-          Linder-Meridian Bikeway, Pine Ave / Temple Dr - Community Project (2025 Construction)

-          Locust Grove Rd and Woodbridge Dr Pedestrian Crossing - Community Project (2023 Construction)

-          Main St and King St Pedestrian Crossing - Community Project (2025 Construction)

-          Maintenance Crack Seal (2025) – HB312 Project - Maintenance Project (2025 Construction)

-          Pine Ave and West 01st St Pedestrian Crossing - Community Project (Future Construction)

-          Pine Ave, Meridian Rd / Locust Grove Rd - Stormwater Basin - Economic Development Project (2021 Construction)

-          Residential Capital Maintenance (2022) – HB312 Project - Maintenance Project (2022 Construction)

o    Bower St, Main St / east end

o    Broadway Ave, East 03rd St / East 06th St

o    Carlton Ave, Main St / East 02 ½ St

o    Cherry Ave, West 04th St / Meridian Rd

o    East 02nd St, Broadway Ave / Carlton Ave

o    East 02 ½ St, Carlton Ave / Fairview Ave

o    East 03rd St / Franklin Rd / Bower St

o    East 04th St, Broadway Ave / State Ave

o    East 04th St, Washington Ave / Janie Ln

o    East 05th St, Franklin Rd / Bower St

o    East 05th St, State Ave / Badley Ave

o    Idaho Ave, West 08th St / Meridian Rd

o    Maple Ave, West 01st St / Meridian Rd

o    State Ave, Main St / Cathy Ln

o    Waltman Ln, west end / Meridian Rd

o    Washington Ave, East 02 ½ St / Cathy Ave

o    Washington St, West 07th St / Meridian Rd

o    West 02nd St, Cherry Ave / Fairview Ave

o    West 03rd St, Pine Ave / north end

o    West 04th St, Broadway Ave / north end

o    West 06th St, Carlton Ave / Washington St

-          Residential Capital Maintenance (2023) – HB312 Project - Maintenance Project (2023 Construction)

o    Rose Cir, West 01st St / West 01st St

o    West 01st St, south end / Franklin Rd

Meridian North

Plan Adopted in 2020 – Next Update 2030

Proposed Projects

-          Bikeway Signage (2024) - Community Project (2024 Construction)

o    Granger Ave Bikeway, Records Ave / Shamrock Ave

o    McMillan-Ustick Bikeway, Linwood Way / Cloverdale Rd

o    Records Way Bikeway, Pine Ave / Chinden Blvd

-          Cherry Ln and Meridian Library Pedestrian Crossing - Community Project (2020-2021 Construction)

-          Cul-de-Sac Reconstruct (2025) – HB312 Project - Maintenance Project (2025 Construction)

-          Cul-de-Sac Repair (2021) – HB312 Project - Maintenance Project (2021 Construction)

-          Cul-de-Sac Repair (2025) – HB312 Project - Maintenance Project (2025 Construction)

-          Fairview Ave and Locust Grove Rd - Intersection Project (2023 Construction)

-          Fairview Ave, Locust Grove Rd / SH 55 (Eagle Rd) - Roadway Project (2023 Construction)

-          Franklin Rd and McDermott Rd - Intersection Project (Future Construction)

-          Linder Rd, Cherry Ln / Ustick Rd - Roadway Project (Future Construction)

-          Linder-Meridian Bikeway, Pine Ave / Temple Dr - Community Project (2025 Construction)

-          Locust Grove Rd and Woodbridge Dr Pedestrian Crossing - Community Project (2023 Construction)

-          Maintenance Crack Seal (2023) – HB312 Project - Maintenance Project (2023 Construction)

-          Maintenance Crack Seal (2025) – HB312 Project - Maintenance Project (2025 Construction)

-          McMillan Rd and Black Cat Rd Interim Signal - Intersection Project (2022 Construction)

-          McMillan Rd, Cortana Way / Goddard Creek Way - Community Project (Future Construction)

-          McMillan Rd, Red Horse Way / Locust Grove Rd - Community Project (Future Construction)

-          Meridian Rd, Cherry Ln / Ustick Rd - Roadway Project (2020-2021 Construction)

-          Meridian Rd, McMillan Rd / US 20/26 (Chinden Blvd) - Roadway Project (Future Construction)

-          Meridian Rd, Ustick Rd / McMillan Rd - Roadway Project (Future Construction)

-          Residential Capital Maintenance (2023) – HB312 Project - Maintenance Project (2023 Construction)

o    Blossom Pl, south end / north end

o    Larkspur Ct, south end / Verbena Dr

o    Laurel Ct, south end / Verbena Dr

o    Lavender Ct, south end / Verbena Dr

o    Lawndale Dr, Crestmont Dr / McGlinchey Ave

o    Lilac St, south end / Verbena Dr

o    McGlinchey Ave, Blossom Pl / West 08th St

-          Star Rd Bridge #1092, 0.35 miles S/O Chinden Blvd - Bridge Project (Future Construction)

-          Star Rd Bridge #1093, 0.25 miles S/O McMillan Rd - Bridge Project (2023 Construction)

-          Star Rd Bridge #2040, 0.28 miles S/O McMillan Rd - Bridge Project (2023 Construction)

-          Ten Mile Rd and Cherry Ln - Intersection Project (Future Construction)

-          Ten Mile Rd, McMillan Rd / US 20/26 (Chinden Blvd) - Roadway Project (2020-2021 Construction)

-          Ten Mile Rd, Ustick Rd / McMillan Rd - Roadway Project (2020-2021 Construction)

-          US 20/26 (Chinden Blvd) and Locust Grove Rd - Intersection Project (2020-2021 Construction)

-          Ustick Rd and Black Cat Rd Interim Signal - Intersection Project (2021 Construction)

-          Ustick Rd, Ten Mile Rd / Linder Rd - Roadway Project (2025 Construction)

-          Wells St Bridge #1224, 0.2 miles S/O Magic View Dr - Bridge Project (Future Construction)

Meridian South

Plan Proposed for 2021

Proposed Projects

-          Amity Rd and Locust Grove Rd Interim Signal - Intersection Project (2023 Construction)

-          Arterial & Collector Capital Maintenance (2022) – HB312 Project - Maintenance Project (2022 Construction)

o    Amity Rd, SH 69 (Meridian Rd) / Locust Grove Rd

o    Harris St, Kentucky Way / SH 69 (Meridian Rd)

o    Victory Rd, McDermott Rd / Ten Mile Rd

-          Aspen Cove Dr Bridge #2084, 280’ W/O Linder Rd - Bridge Project (Future Construction)

-          Cul-de-Sac Repair (2021) – HB312 Project - Maintenance Project (2021 Construction)

-          Eagle Rd and Amity Rd Roundabout (Dual Lane) - Intersection Project (2021 Construction)

-          Eagle Rd, Amity Rd / Victory Rd - Roadway Project (2021 Construction)

-          Eagle Rd, Lake Hazel Rd / Amity Rd - Roadway Project (2023 Construction)

-          Hollandale-Targee Bikeway, Locust Grove / Targee St - Community Project (2024 Construction)

-          Lake Hazel Rd and Eagle Rd - Intersection Project (2022 Construction)

-          Lake Hazel Rd, Eagle Rd / Cloverdale Rd - Roadway Project (2024 Construction)

-          Linder Rd, Overland Rd / Franklin Rd - Roadway Project (Future Construction)

-          Locust Grove Rd Bridge #1207, 0.17 miles S/O Victory Rd - Bridge Project (Future Construction)

-          Locust Grove Rd and Palermo Dr Pedestrian Crossing - Community Project (2023 Construction)

-          Locust Grove Rd, Victory Rd / Overland Rd - Roadway Project (2022 Construction)

-          Maintenance Crack Seal (2020) – HB312 Project - Maintenance Project (2020-2021 Construction)

-          Maintenance Crack Seal (2025) – HB312 Project - Maintenance Project (2025 Construction)

-          Overland Rd and Eagle Rd - Intersection Project (Future Construction)

-          Residential Capital Maintenance (2023) – HB312 Project - Maintenance Project (2023 Construction)

o    Country Terrace Way, south end / Overland Rd

o    Francine Pl, Victory Rd / north end

o    Tobago Ct, west end / East 05th Way

-          Stoddard Rd, Victory Rd / Overland Rd - Community Project (2024 Construction)

-          Ten Mile Rd and Victory Rd - Intersection Project (2022-2023 Construction)

-          Ten Mile Rd and Amity Rd - Intersection Project (2021 Construction)

-          Ten Mile Rd and Lake Hazel Rd - Intersection Project (Future Construction)

-          Ten Mile Rd, Victory Rd / Overland Rd - Roadway Project (2022-2023 Construction)

-          Topaz Ave Bridge #1220, 0.1 miles N/O Overland Rd - Bridge Project (2025 Construction)

-          Victory Rd and Standing Timber Ave Pedestrian Crossing - Community Project (2020-2021 Construction)

-          Victory Rd and Locust Grove Rd Roundabout - Intersection Project (2022 Construction)

-          Victory Rd, Eagle Rd / Cloverdale Rd - Roadway Project (Future Construction)

-          Victory Rd, Locust Grove Rd / Eagle Rd - Roadway Project (Future Construction)

-          Victory Rd, SH 69 (Meridian Rd) / Locust Grove Rd - Roadway Project (2025 Construction)

Star

Plan Adopted in 2018 – Next Update 2028

Proposed Projects

-          Arterial & Collector Capital Maintenance (2023) – HB312 Project - Maintenance Project (2023 Construction)

o    New Hope Rd, Can Ada Rd / Wing Rd

-          Brandon Rd Bridge #1460, 550’ N/O Floating Feather Rd - Bridge Project (2025 Construction)

-          Can Ada Rd Bridge #1004, 740’ N/O SH 44 (State St) - Bridge Project (Future Construction)

-          Cul-de-Sac Reconstruct (2025) - HB312 Project - Maintenance Project (2025 Construction)

-          Cul-de-Sac Repair (2025) - HB312 Project - Maintenance Project (2025 Construction)

-          Floating Feather Rd Bridge #2028, 580’ E/O Munger Rd - Bridge Project (2024 Construction)

-          Floating Feather Rd, Brandon Rd / Hornback Ave - Community Project (2023 Construction)

-          Maintenance Crack Seal (2023) – HB312 Project - Maintenance Project (2023 Construction)

-          Munger Rd Bridge #1005 and #2001, ½ mile S/O New Hope Rd - Bridge Project (Future Construction)

-          Munger Rd Bridge #1462, 550’ S/O New Hope Rd - Bridge Project (2024 Construction)

-          Pollard Ln, Floating Feather Rd / Star Middle School - Community Project (2023 Construction)

-          Star Rd, Main St / SH 44 (State St) – Community Project (Future Construction)

External Funding Plan

Introduction

The funding plan portion of the IFYWP focuses external funding efforts on the Commission’s approved focus areas adopted in the ACHD Strategic Plan (2016).  External funding comes from funding sources that are not codified by State of Idaho code or fee regiment for use by ACHD, with most of these funds coming from Federal Highway Administration programs.  The funding plan ensures funding applications are timely and supported by the Commission.  All local match funding is reviewed and approved by the Commission when the project agreement is presented for approval.

Federal Capital Improvements

ACHD receives Surface Transportation Block Grant Program (STBG) Transportation Management Area (TMA) funding for qualified, capital improvements on Arterials and Collectors.  Per Communities in Motion 2040, COMPASS programs 82% of STBG TMA funding for ACHD’s roadway improvement needs. Local match requirements for STBG funding is 7.34% of project cost.  Improvement projects are identified by Pavement Management staff at the time of design. 

ACHD has an annual funding target of $27 million to $34 million for its Pavement Management program. Current funding for the program comes from 3 primary sources:

-          Operational Maintenance by ACHD Forces

o    2021 - $9.53 million

o    2022 - $9.63 million

o    2023 - $9.72 million

o    2024 - $9.82 million

o    2025 - $9.92 million

-          Federal Aid Capital Improvements

o    2021 - $8.84 million

o    2022 - $9.00 million

o    2023 - $8.74 million

o    2024 - $8.46 million

o    2025 - $8.26 million

-          Local Capital Maintenance

o    2021 - $9.33 million

o    2022 - $10.88 million

o    2023 - $9.01 million

o    2024 - $9.51 million

o    2025 - $9.82 million

The above estimated five-year capital improvement need is based on ACHD’s Pavement Management Engineer’s evaluation of the StreetSaver Model’s Pavement Condition Index (PCI) data. 2021-2025 funding need based on a Pavement Condition Index (PCI) of 85 and 0% inflation and interest rate for Arterial, Collector, and Residential streets.  This data is updated annually for Ada County roadways. Funding includes House Bill 312 maintenance funding.

Additional Capital Improvement and Safety Needs

There are several competitive funding programs that are administrated by FHWA, FTA, FEMA, ITD and LHTAC.  Each of these programs has its own set of restrictions and funding limitations.  For example, programs such as STBG-Urban funds may be used for capital improvements projects within the cities of Kuna or Star, and STBG-Rural funds may be used in Ada County outside of the TMA and Urban boundaries.

Project Name                        Fairview Ave Bridges # 2196 and #2197

Project Description         Reconstruct the existing deficient bridges over the Boise River.

Cost                                             $8.4 million  

Local Match                          $0.6 million to $3.4 million

Possible Funding                Build, Federal Bridge Program and INFRA Grant

 

Project Name                        Replace Bridge The Creates Flood Hazards

Project Description         Reconstruct bridge to eliminate 100-year flooding hazard created by existing bridge.

Cost                                             $0.5 million to $2.0 million       

Local Match                          $0.6 million to $3.4 million

Possible Funding                FEMA and BRIC

 

Project Name                        Curb Ramps at Joint ITD-ACHD Intersections

Project Description         Bring non-compliant curb ramps to ADA standards where ACHD sidewalks intersect ITD routes.

Cost                                             $60,000        

Local Match                          $0

Possible Funding                Idaho Americans with Disabilities Act Curb Ramp Program

 

Project Name                        Mini Roundabout Project

Project Description         To improve safety, convert the Rose Hill St/Owyhee St intersection to a mini roundabout.

Cost                                             $0.3 million  

Local Match                          $22,000

Possible Funding                LHSIP

 

Project Name                        American Blvd and 15th St Bike Lane Gap

Project Description         To improve safety at 15th St, widen Americana Blvd to the north to accommodate 5’ bike lanes.

Cost                                             $0.3 million  

Local Match                          $22,000

Possible Funding                LHSIP

 

Project Name                        Five Mile Rd, Overland Rd / Franklin Rd

Project Description         With ITD, reconstruct I-84 overpass & widen Five Mile Rd to five lanes, sidewalk & enhanced bike lanes.

Cost                                             $16.3 million

Local Match                          $3.3 million less ITD’s portion

Possible Funding                BUILD Grant

 

Project Name                        NEPA Study

Project Description         NEPA study for a future bridge or road improvement project.

Cost                                             $0.3 million to $1.5 million

Local Match                          $50,000 to $0.3 million

Possible Funding                BUILD Grant

 

Project Name                        ACHD Rural Improvement Project

Project Description         Reconstruct Maple Grove Rd, from south end to Lake Hazel Rd, which was not built to modern standards. 

Cost                                             $1.2 million

Local Match                          $89,000 to $0.2 million

Possible Funding                STPG-Rural or State Grant

 

Project Name                        ACHD Rural Improvement Project

Project Description         Improve safety & freight travel along Kuna-Mora Rd adding paved shoulders at turns west of I-84.

Cost                                             $1.0 million

Local Match                          $74,000

Possible Funding                STPG-Rural or State Grant

 

Project Name                        Enhanced Improvement Project

Project Description         Improve safety & freight travel along Kuna-Mora Rd adding paved shoulders at turns west of I-84.

Cost                                             $1.0 million X 2 projects

Local Match                          $0

Possible Funding                State Grant

 

Bicycle and Pedestrian Safety Project Needs

Arterial roadways, with their higher traffic volumes require added consideration to safely accommodate bikes and pedestrians.   These projects will install as appropriate, low-stress bike route alternatives, enhanced pedestrian crossings on arterial roadways, and fill sidewalk gaps.  Enhanced crossings include Accessible Pedestrian Signals (APS), Pedestrian Hybrid Beacon (PHB) and Rectangular Rapid Flashing Beacon (RRFB).

Project Name                        Vista Ave and Nez Perce St Pedestrian Crossing

Project Description         Install a PHB.

Cost                                             $0.3 million

Local Match                          $19,000

Possible Funding                TAP

 

Project Name                        Hays St at 10th St and 11th St Pedestrian Crossings

Project Description         Install RRFBs.

Cost                                             $0.3 million

Local Match                          $24,000

Possible Funding                TAP

 

Project Name                        Overland Rd and Phillippi St Pedestrian Crossings

Project Description         Install a PHB.

Cost                                             $0.3 million

Local Match                          $23,000

Possible Funding                TAP

 

Project Name                        11th St Improvement and Bikeway, State St / Heron St

Project Description         Complete roadway improvements & add bikeway on 11th St from Fort to Heron.

Cost                                             $1.0 million

Local Match                          $77,000

Possible Funding                TAP

 

Project Name                        Kootenai St Traffic Calming, Orchard St / Vista Ave

Project Description         Implement components of the Kootenai St Traffic Calming Concept Study.

Cost                                             $1.5 million

Local Match                          $0.1 million

Possible Funding                TAP

 

Proactively Address Environmental Regulations

To address air quality and stormwater requirements, ACHD will seek funding to implement innovative projects and training to prepare for broader regulatory requirements.  Funds would implement stormwater projects to lower Boise River Total Maximum Daily Load (TMDL) and meet NPDES permit requirements.  In addition, look for opportunities to improve ACHD operations with proven green technologies.

Project Name                         GSI Technical Assistance Grant

Project Description         Technical assistance to develop a GSI Maintenance and Operations Plan for green infrastructure.

Cost                                             $50,000

Local Match                          As required

Possible Funding                EPA Tech. Assistance Services for Communities

 

Project Name                         GSI Infrastructure Supportive Curriculum

Project Description         To increase qualified contractors, develop with College of Western Idaho a certified horticulture curriculum for maintenance of stormwater facilities. 

Cost                                             $50,000

Local Match                          $4,000 minimum

Possible Funding                EPA Urban Waters Small Grant

 

Project Name                         GSI Infrastructure Projects

Project Description         Fund permeable paver retrofit of alleys in downtown Boise.

Cost                                             $0.1 million plus

Local Match                          As required

Possible Funding                Federal source

 

Project Name                         GSI Infrastructure Projects

Project Description         Fund permeable paver retrofit of alleys adjacent to Meridian Community Center.

Cost                                             $50,000

Local Match                          As required

Possible Funding                Federal source

 

Project Name                         GSI Infrastructure Projects

Project Description         Fund retrofit of stormwater system in Main/Fairview corridor with cost-share from CCDC.  Projects may include permeable alley, bioretention planters and tree planters.

Cost                                             $0.2 million

Local Match                          As required with cost share

Possible Funding                TAP & other Federal source

 

Project Name                         Supporting Idaho Forrest Action Plan

Project Description         Pilot project to process and use organic materials collected by street sweeping operations to eliminate waste.  Funds will purchase necessary equipment

Cost                                             $0.1 million

Local Match                          $10,000

Possible Funding                Idaho Department of Lands

 

Project Name                         Replace or Upgrade Old Diesel Engines

Project Description         Replace existing construction equipment’s diesel motor with new clean diesel motor.

Cost                                             $10,000 to $50,000

Local Match                          As required

Possible Funding                EPA & STP-TMA

Enhancement Projects

The Strategic Plan identifies ACHD Secondary Focus as enhancements to provide congestion relief and invest in communities.   Secondary Focus projects also include cooperative projects with ITD, cities and businesses that support economic growth and job creation.

Project Name                         NEPA Study & Design for Linder Rd, Overland Rd / Franklin Rd

Project Description         Conduct a NEPA study & design for Linder Rd overpass and road improvement project. Project would be in coordination with ACHD partners

Cost                                             $1.5 million

Local Match                          $0.3 million with cost share

Possible Funding                BUILD & INFRA grants

 

Project Name                         ACHD-ITD Joint Intersections

Project Description         Partner with ITD to improve the ACHD portion of intersections with State Highway projects

Cost                                             $0.5 million to $10.0 million

Local Match                          $19,000 to $2.0 million

Possible Funding                BUILD, STBG-TMA & INFRA grants

 

Project Name                         Sidewalk Gaps

Project Description         Fill sidewalk gaps in existing ACHD system

Cost                                             $0.15 million

Local Match                          $11,000

Possible Funding                TAP

 

Project Name                         Maintaining Power in an Emergency

Project Description         Purchase necessary stand-by power systems for both Adams St and Cloverdale Rd facilities.

Cost                                             $0.24 million

Local Match                          $59,000

Possible Funding                HSGP, SHSP, UASIP & EMPG

 

Project Name                         Implement Regional Low-Stress Bike Routes

Project Description         Seek funding to implement Bike Master Plan projects

Cost                                             $25,000 to $0.5 million

Local Match                          $0 - $37,000

Possible Funding                TAP

 

Project Name                         New Bike and Pedestrian Facility Evaluation

Project Description         Conduct study to evaluate the effectiveness of bike and pedestrian plans to integrate new facilities into the existing system

Cost                                             $25,000

Local Match                          As required

Possible Funding                COMPASS Planning Grant

 

Project Name                         Conduit and Fiber for CCTV and Signal Interconnect

Project Description         Install conduit and fiber along Ada County roadways to interconnect signals and install CCTV cameras if needed

Cost                                             $0.3 million

Local Match                          $22,000

Possible Funding                FHWA Program

 

Project Name                         Arterial Dynamic Message Signs

Project Description         Install four (4) arterial Dynamic Message Signs on major arterials at critical intersections

Cost                                             $0.3 million

Local Match                          $22,000

Possible Funding                FHWA Program

 

Project Name                         Purchase 13-Passenger Vans and Minivans

Project Description         For Commuteride fleet, purchase thirteen-seat vans and minivans to replace vehicles according to vehicle replacement schedule

Cost                                             Varies per year

Local Match                          7.34% - 20% match

Possible Funding                FTA 5307 Formula, FTA 5339 Small Urban or Rural

 

Project Name                         Park and Ride Site Development

Project Description         Develop and construct park and ride site in Ada County to support Commuteride program.  Site locations will be based on FY2021 COMPASS Park & Ride Study.

Cost                                             $1.0 million

Local Match                          $74,000 - $0.2 million

Possible Funding                FTA or STBG-TMA


 

Bridges Program

Major Bridges

Project Name                        Eckert Rd Bridge #2147 and #2148, Boise River / Ridenbaugh Canal

Project Description         Replace bridge #2147 over the Boise River and bridge #2148 over the Ridenbaugh Canal as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Major Bridges

City Location                        Boise

Design Year                             Future

Design Cost                             $250,000

Right-of-Way Year          Future

Right-of-Way Cost             $0

Construction Year           Future

Construction Cost           $0

Project Manager                Dale Kuperus

 

Project Name                        Fairview Ave Bridge #2196 and #2197, Boise River

Project Description         Replace bridges #2196 and #2197 over the Boise River as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Major Bridges

City Location                        Boise

Design Year                             Future

Design Cost                             $900,000

Right-of-Way Year          Future

Right-of-Way Cost             $0

Construction Year           Future

Construction Cost           $7,497,000

Project Manager                Dale Kuperus

 

Project Name                        Floating Feather Rd Bridge #2028, 580' E/O Munger Rd

Project Description         Replace/widen bridge #2028 over Middleton Canal on Floating Feather Rd as part of ACHD's Bridge Maintenance Program. Includes a detached pathway on the south side between Wild Mustang and Meadow Lake.

Project Program                Bridges Program         

Project Sub-Program      Major Bridges

City Location                        Star

Design Year                             2021

Design Cost                             $194,000

Right-of-Way Year          2023

Right-of-Way Cost             $78,000

Construction Year           2024

Construction Cost           $1,731,000

Project Manager                David Rader

 

Project Name                        Gowen Rd Bridge #2110, W/O I-84

Project Description         Replace bridge #2110 over the UPRR tracks as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Major Bridges

City Location                        Boise

Design Year                             2019-2020

Design Cost                             $547,000

Right-of-Way Year          2020

Right-of-Way Cost             $2,000

Construction Year           2021

Construction Cost           $7,639,000

Project Manager                Brian McCarthy

 

Project Name                        Pierce Park Ln Bridge #2029, at Hill Rd

Project Description         Replace bridge #2029 over the Farmers Union Canal on Pierce Park Ln as part of ACHD's Bridge Maintenance Program. Includes reconstruction of the intersection to the 2016 CIP configuration.

Project Program                Bridges Program         

Project Sub-Program      Major Bridges

City Location                        Boise

Design Year                             2022

Design Cost                             $455,000

Right-of-Way Year          2023

Right-of-Way Cost             $673,000

Construction Year           Future

Construction Cost           $3,595,000

Project Manager                Brian McCarthy

 

Minor Bridges

Project Name                        11th St Bridge #1493, 90' N/O Main St

Project Description         Replace bridge #1493 over the Boise City Canal on 11th St as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2023

Design Cost                             $117,000

Right-of-Way Year          2024

Right-of-Way Cost             $2,000

Construction Year           Future

Construction Cost           $380,000

Project Manager                Ryan Cutler

 

Project Name                        16th St Bridge #1484, 150' N/O Washington St

Project Description         Replace bridge #1484 over the Boise City Canal on 16th St as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2024

Design Cost                             $38,000

Right-of-Way Year          Future

Right-of-Way Cost             $2,000

Construction Year           Future

Construction Cost           $408,000

Project Manager                Dale Kuperus

 

Project Name                        24th St Road and Bridge Projects

Project Description         Replace bridges #1466 on Irene St, #1467 on 24th St, and #1468 on Bella St over the Boise City Canal as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2019

Design Cost                             $196,000

Right-of-Way Year          2020

Right-of-Way Cost             $10,000

Construction Year           2022

Construction Cost           $1,273,000

Project Manager                David Rader

 

Project Name                        26th St Bridge #1321, 160' S/O Hill Rd

Project Description         Replace bridge #1321 over the Boise City Canal on 26th St as part of ACHD's Bridge Maintenance Program. Includes sidewalk connection on the west side to Hill Rd.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2021

Design Cost                             $64,000

Right-of-Way Year          2022

Right-of-Way Cost             $8,000

Construction Year           2023

Construction Cost           $336,000

Project Manager                David Rader

 

Project Name                        32nd St Bridge #1308, 50’ S/O Hill Rd

Project Description         Replace bridge #1308 over the Boise City Canal on 32nd St as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2019

Design Cost                             $49,000

Right-of-Way Year          2019

Right-of-Way Cost             $6,000

Construction Year           2021

Construction Cost           $285,000

Project Manager                Seth Jarsky

 

Project Name                        33rd St Bridge #1318, 20’ S/O Forsythia St

Project Description         Replace bridge #1318 over the Boise City Canal on 33rd St as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2019

Design Cost                             $49,000

Right-of-Way Year          2019

Right-of-Way Cost             $5,000

Construction Year           2021

Construction Cost           $241,000

Project Manager                Seth Jarsky

 

Project Name                        37th St Bridge #1441, 350' SW/O Adams St

Project Description         Replace bridge #1441 over Thurman Mill on 37th St as part of ACHD's Bridge Maintenance Program. In-house design.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Garden City

Design Year                             2021

Design Cost                             $0

Right-of-Way Year          2022

Right-of-Way Cost             $5,000

Construction Year           2025

Construction Cost           $260,000

Project Manager                Chris Dayley

 

Project Name                        38th St Bridge #1440, 0.2 miles N/O Chinden Blvd

Project Description         Replace bridge #1440 over the Thurman Mill Canal on 38th St as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Garden City

Design Year                             2019-2020

Design Cost                             $55,000

Right-of-Way Year          2019

Right-of-Way Cost             $9,000

Construction Year           2021

Construction Cost           $286,000

Project Manager                Chris Dayley

 

Project Name                        41st St Bridge #1437, 600' N/O Chinden Blvd

Project Description         Replace bridge #1437 over the Thurman Mill Canal on 41st St as part of ACHD's Bridge Maintenance Program. In-house design.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Garden City

Design Year                             2018

Design Cost                             $2,000

Right-of-Way Year          2019

Right-of-Way Cost             $6,000

Construction Year           2021

Construction Cost           $105,000

Project Manager                Jason Tugby

 

Project Name                        44th St Bridge #1433, 0.1 miles N/O Chinden Blvd

Project Description         Replace bridge #1433 over the Thurman Mill Canal on 44th St as part of ACHD's Bridge Maintenance Program. In-house design.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Garden City

Design Year                             2019

Design Cost                             $2,000

Right-of-Way Year          2019

Right-of-Way Cost             $12,000

Construction Year           2021

Construction Cost           $175,000

Project Manager                Jason Tugby

 

Project Name                        45th St Bridge #1432, 500' N/O Chinden Blvd

Project Description         Replace bridge #1432 over the Thurman Mill Canal on 45th St as part of ACHD's Bridge Maintenance Program. In-house design.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Garden City

Design Year                             2019

Design Cost                             $2,000

Right-of-Way Year          2019

Right-of-Way Cost             $8,000

Construction Year           2022

Construction Cost           $132,000

Project Manager                Jason Tugby

 

Project Name                        Aspen Cove Dr Bridge #2084, 280' W/O Linder Rd

Project Description         Replace bridge #2084 over the Ridenbaugh Canal on Aspen Cove Dr as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Meridian

Design Year                             2025

Design Cost                             $72,000

Right-of-Way Year          Future

Right-of-Way Cost             $36,000

Construction Year           Future

Construction Cost           $490,000

Project Manager                Dale Kuperus

 

Project Name                        Black Cat Rd Bridge #1305, 0.21 miles N/O King Rd

Project Description         Replace bridge #1305 over the Benton Lateral on Black Cat Rd as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Ada County

Design Year                             2021

Design Cost                             $120,000

Right-of-Way Year          2022

Right-of-Way Cost             $7,000

Construction Year           2025

Construction Cost           $495,000

Project Manager                Chris Dayley

 

Project Name                        Brandon Rd Bridge #1460, 550' N/O Floating Feather Rd

Project Description         Replace bridge #1460 over Dry Creek Canal on Brandon Rd as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Star

Design Year                             2022

Design Cost                             $85,000

Right-of-Way Year          2023

Right-of-Way Cost             $39,000

Construction Year           2025

Construction Cost           $594,000

Project Manager                Jason Tugby

 

Project Name                        Bridge Preventative Maintenance (2021)

Project Description         Bridge deck overlay and sealing of specified bridges. Locations to be identified as part of ACHD’s Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise, Garden City

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $200,000

Project Manager                Dale Kuperus

 

Project Name                        Bridge Preventative Maintenance (2022)

Project Description         Bridge deck overlay and sealing of specified bridges. Locations to be identified as part of ACHD’s Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $100,000

Project Manager                Dale Kuperus

 

Project Name                        Bridge Preventative Maintenance (2023)

Project Description         Bridge deck overlay and sealing of specified bridges. Locations to be identified as part of ACHD’s Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $100,000

Project Manager                Dale Kuperus

 

Project Name                        Bridge Preventative Maintenance (2024)

Project Description         Bridge deck overlay and sealing of specified bridges. Locations to be identified as part of ACHD’s Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $100,000

Project Manager                Dale Kuperus

 

Project Name                        Bridge Preventative Maintenance (2025)

Project Description         Bridge deck overlay and sealing of specified bridges. Locations to be identified as part of ACHD’s Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $100,000

Project Manager                Dale Kuperus

 

Project Name                        Bryson Ave Bridge #1134, 750' N/O Fairview Ave

Project Description         Replace bridge #1134 over the South Slough on Bryson Ave as part of ACHD's Bridge Maintenance Program.  In-house design.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2020

Design Cost                             $0

Right-of-Way Year          2021

Right-of-Way Cost             $3,000

Construction Year           2022

Construction Cost           $242,000

Project Manager                Chris Dayley

 

Project Name                        Can Ada Rd Bridge #1004, 740' N/O SH 44 (State St)

Project Description         Replace bridge #1004 over an irrigation ditch on Can Ada Rd as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Star

Design Year                             2023

Design Cost                             $17,000

Right-of-Way Year          2024

Right-of-Way Cost             $18,000

Construction Year           Future

Construction Cost           $108,000

Project Manager                Dale Kuperus

 

Project Name                        Carlsbad Way Bridge #1419, 500' N/O State St

Project Description         Replace bridge #1419 over the Boise Valley Canal on Carlsbad Way as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2022

Design Cost                             $40,000

Right-of-Way Year          2023

Right-of-Way Cost             $4,000

Construction Year           2025

Construction Cost           $272,000

Project Manager                Brian McCarthy

 

Project Name                        Columbia Rd Bridge #1283, 0.2 miles E/O Ten Mile Rd

Project Description         Replace bridge #1283 over the Kuna Canal on Columbia Rd as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Ada County, Kuna

Design Year                             2021

Design Cost                             $90,000

Right-of-Way Year          2022

Right-of-Way Cost             $20,000

Construction Year           2024

Construction Cost           $507,000

Project Manager                Seth Jarsky

 

Project Name                        Crewe Ave Bridge #1046, 300' S/O Devonwood Dr

Project Description         Replace bridge #1046 over Spoil Bank Canal on Crewe Ave as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2023

Design Cost                             $56,000

Right-of-Way Year          2024

Right-of-Way Cost             $17,000

Construction Year           Future

Construction Cost           $381,000

Project Manager                Ryan Cutler

 

Project Name                        Fiddler Dr Bridge #1510, 130' W/O Arlen Dr

Project Description         Replace bridge #1510 over the Zinger Lateral on Fiddler Dr as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2021

Design Cost                             $50,000

Right-of-Way Year          2022

Right-of-Way Cost             $3,000

Construction Year           2024

Construction Cost           $328,000

Project Manager                Ryan Cutler

 

Project Name                        Floating Feather Rd Bridge #1513, 0.1 miles E/O Palmer Ln

Project Description         Replace bridge #1513 over Foothill Ditch on Floating Feather Rd as part of ACHD's Bridge Maintenance Program. Project to be built in coordination with Palmer Ln Bridge #1009. In-house design.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Eagle

Design Year                             2021

Design Cost                             $3,000

Right-of-Way Year          2022

Right-of-Way Cost             $19,000

Construction Year           2023

Construction Cost           $115,000

Project Manager                Cody Homan

 

Project Name                        Hanley Pl Bridge #1056, 700' N/O Chaparral Rd

Project Description         Replace bridge #1056 over Willow Creek on Hanley Pl as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Ada County

Design Year                             2021

Design Cost                             $105,000

Right-of-Way Year          2022

Right-of-Way Cost             $17,000

Construction Year           2023

Construction Cost           $565,000

Project Manager                Joe Tate

 

Project Name                        Lena Ave Bridge #1509, 125' N/O Hickory Dr

Project Description         Replace bridge #1509 over the Zinger Lateral on Lena Ave as part of ACHD's Bridge Maintenance Program. In-house design.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2021

Design Cost                             $0

Right-of-Way Year          2022

Right-of-Way Cost             $3,000

Construction Year           2023

Construction Cost           $282,000

Project Manager                Brian McCarthy

 

Project Name                        Locust Grove Rd Bridge #1207, 0.17 miles S/O Victory Rd

Project Description         Replace bridge #1207 over the Ten Mile Creek on Locust Grove Rd Rd as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Meridian

Design Year                             2023

Design Cost                             $110,000

Right-of-Way Year          2024

Right-of-Way Cost             $63,000

Construction Year           Future

Construction Cost           $440,000

Project Manager                Dale Kuperus

 

Project Name                        Mallard Ave Bridge #1339, 650' W/O Parkcenter Blvd

Project Description         Replace bridge #1339 over Loggers Creek on Mallard Ave as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2021

Design Cost                             $100,000

Right-of-Way Year          2022

Right-of-Way Cost             $12,000

Construction Year           2023

Construction Cost           $673,000

Project Manager                Chris Dayley

 

Project Name                        Munger Rd Bridge #1005 and #2001, 1/2 mile S/O New Hope Rd

Project Description         Replace bridge #1005 over the Dry Creek Canal and bridge #2001 over the Middleton Canal as part of ACHD's Bridge Maintenance Program. Road Trust Funds are available for this project.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Star

Design Year                             2023

Design Cost                             $105,000

Right-of-Way Year          Future

Right-of-Way Cost             $125,000

Construction Year           Future

Construction Cost           $1,040,000

Project Manager                Seth Jarsky

 

Project Name                        Munger Rd Bridge #1462, 550' S/O New Hope Rd

Project Description         Replace bridge #1462 over Foothill Ditch on Munger Rd as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Star

Design Year                             2021

Design Cost                             $46,000

Right-of-Way Year          2022

Right-of-Way Cost             $17,000

Construction Year           2024

Construction Cost           $294,000

Project Manager                Seth Jarsky

 

Project Name                        Palmer Ln Bridge #1009, N/O Floating Feather Rd

Project Description         Replace bridge #1009 over Foothill Ditch on Palmer Ln as part of ACHD's Bridge Maintenance Program. In-house design. Project to be built in coordination with Floating Feather Rd Bridge #1513.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Star

Design Year                             2021

Design Cost                             $3,000

Right-of-Way Year          2022

Right-of-Way Cost             $3,000

Construction Year           2023

Construction Cost           $115,000

Project Manager                Cody Homan

 

Project Name                        Parkhill Dr Bridge #1383, 200' W/O 15th St

Project Description         Replace bridge #1383 over the Crane Creek on Parkhill Dr as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2021

Design Cost                             $50,000

Right-of-Way Year          2022

Right-of-Way Cost             $3,000

Construction Year           2025

Construction Cost           $425,000

Project Manager                David Rader

 

Project Name                        Phillippi St Bridge #1366, 650' N/O Overland Rd

Project Description         Replace bridge #1366 over Farmers Lateral on Phillippi St as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2021

Design Cost                             $49,000

Right-of-Way Year          2022

Right-of-Way Cost             $3,000

Construction Year           2024

Construction Cost           $368,000

Project Manager                Jason Tugby

 

Project Name                        Reutzel Dr Bridge #1249, 165' W/O Summerset Way

Project Description         Replace bridge #1249 over Eight Mile Creek on Reutzel Dr as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Ada County

Design Year                             2021

Design Cost                             $89,000

Right-of-Way Year          2022

Right-of-Way Cost             $20,000

Construction Year           2024

Construction Cost           $486,000

Project Manager                Chris Dayley

 

Project Name                        Shamrock Ave Bridge #1424, 0.1 miles N/O Fairview Ave

Project Description         Replace bridge #1424 over the South Slough on Shamrock Ave as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2019-2020

Design Cost                             $44,000

Right-of-Way Year          2020

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $202,000

Project Manager                Joe Tate

 

Project Name                        Shoup Ave Bridge #1404, 0.25 miles W/O Maple Grove Rd

Project Description         Replace bridge #1404 over the Farmers Lateral on Shoup Ave as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2021

Design Cost                             $63,000

Right-of-Way Year          2022

Right-of-Way Cost             $6,000

Construction Year           2023

Construction Cost           $255,000

Project Manager                Cody Homan

 

Project Name                        Star Rd Bridge #1092, 0.35 miles S/O Chinden Blvd

Project Description         Replace bridge #1092 over Middle Tap Sublateral on Star Rd as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Ada County

Design Year                             2025

Design Cost                             $85,000

Right-of-Way Year          Future

Right-of-Way Cost             $57,000

Construction Year           Future

Construction Cost           $569,000

Project Manager                Dale Kuperus

 

Project Name                        Star Rd Bridge #1093, 0.25 miles S/O McMillan Rd

Project Description         Replace bridge #1093 over Lawrence Kennedy Canal on Star Rd as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Ada County

Design Year                             2021

Design Cost                             $55,000

Right-of-Way Year          2022

Right-of-Way Cost             $19,000

Construction Year           2023

Construction Cost           $197,000

Project Manager                Cody Homan

 

Project Name                        Star Rd Bridge #2040, 0.28 miles S/O McMillan Rd

Project Description         Replace bridge #2040 over Five Mile Creek Feeder on Star Rd as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Ada County

Design Year                             2021

Design Cost                             $140,000

Right-of-Way Year          2022

Right-of-Way Cost             $70,000

Construction Year           2023

Construction Cost           $670,000

Project Manager                Cody Homan

 

Project Name                        Topaz Ave Bridge #1220, 0.1 miles N/O Overland Rd

Project Description         Replace bridge #1220 over the Five Mile Creek on Topaz Ave as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Meridian

Design Year                             2022

Design Cost                             $62,000

Right-of-Way Year          2023

Right-of-Way Cost             $4,000

Construction Year           2025

Construction Cost           $555,000

Project Manager                Jason Tugby

 

Project Name                        Wells St Bridge #1224, 0.2 miles S/O Magic View Dr

Project Description         Replace bridge #1224 over the Five Mile Creek on Wells St as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Meridian

Design Year                             2024

Design Cost                             $29,000

Right-of-Way Year          2025

Right-of-Way Cost             $3,000

Construction Year           Future

Construction Cost           $586,000

Project Manager                Dale Kuperus

 

Project Name                        Wildwood St Bridge #1425, 0.1 miles N/O Fairview Ave

Project Description         Replace bridge #1425 over the South Slough on Wildwood St as part of ACHD's Bridge Maintenance Program.

Project Program                Bridges Program         

Project Sub-Program      Minor Bridges

City Location                        Boise

Design Year                             2021

Design Cost                             $66,000

Right-of-Way Year          2022

Right-of-Way Cost             $61,000

Construction Year           2024

Construction Cost           $307,000

Project Manager                Joe Tate

 

Capital Investment Program

Cooperative

Project Name                        Corridor Preservation - Impact Fee Eligible (2021)

Project Description         Purchase right-of-way and fund improvements in conjunction with development to protect and preserve transportation corridors as per the ACHD Master Street Map.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          2021

Right-of-Way Cost             $750,000

Construction Year           N/A

Construction Cost           $750,000

Project Manager                Christy Little

 

Project Name                        Corridor Preservation - Impact Fee Eligible (2022)

Project Description         Purchase right-of-way and fund improvements in conjunction with development to protect and preserve transportation corridors as per the ACHD Master Street Map.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          2022

Right-of-Way Cost             $750,000

Construction Year           N/A

Construction Cost           $1,250,000

Project Manager                Christy Little

 

Project Name                        Corridor Preservation - Impact Fee Eligible (2023)

Project Description         Purchase right-of-way and fund improvements in conjunction with development to protect and preserve transportation corridors as per the ACHD Master Street Map.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          2023

Right-of-Way Cost             $1,500,000

Construction Year           N/A

Construction Cost           $0

Project Manager                Christy Little

 

Project Name                        Corridor Preservation - Impact Fee Eligible (2024)

Project Description         Purchase right-of-way and fund improvements in conjunction with development to protect and preserve transportation corridors as per the ACHD Master Street Map.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          2024

Right-of-Way Cost             $1,500,000

Construction Year           N/A

Construction Cost           $0

Project Manager                Christy Little

 

Project Name                        Corridor Preservation - Impact Fee Eligible (2025)

Project Description         Purchase right-of-way and fund improvements in conjunction with development to protect and preserve transportation corridors as per the ACHD Master Street Map.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          2025

Right-of-Way Cost             $1,500,000

Construction Year           N/A

Construction Cost           $0

Project Manager                Christy Little

 

Project Name                        Corridor Preservation - Non-Impact Fee Eligible (2021)

Project Description         Purchase right-of-way and fund improvements in conjunction with development to protect and preserve transportation corridors as per the ACHD Master Street Map.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          2021

Right-of-Way Cost             $450,000

Construction Year           N/A

Construction Cost           $0

Project Manager                Christy Little

 

Project Name                        Corridor Preservation - Non-Impact Fee Eligible (2022)

Project Description         Purchase right-of-way and fund improvements in conjunction with development to protect and preserve transportation corridors as per the ACHD Master Street Map.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          2022

Right-of-Way Cost             $450,000

Construction Year           N/A

Construction Cost           $0

Project Manager                Christy Little

 

Project Name                        Corridor Preservation - Non-Impact Fee Eligible (2023)

Project Description         Purchase right-of-way and fund improvements in conjunction with development to protect and preserve transportation corridors as per the ACHD Master Street Map.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          2023

Right-of-Way Cost             $200,000

Construction Year           N/A

Construction Cost           $0

Project Manager                Christy Little

 

Project Name                        Corridor Preservation - Non-Impact Fee Eligible (2024)

Project Description         Purchase right-of-way and fund improvements in conjunction with development to protect and preserve transportation corridors as per the ACHD Master Street Map.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          2024

Right-of-Way Cost             $200,000

Construction Year           N/A

Construction Cost           $0

Project Manager                Christy Little

 

Project Name                        Corridor Preservation - Non-Impact Fee Eligible (2025)

Project Description         Purchase right-of-way and fund improvements in conjunction with development to protect and preserve transportation corridors as per the ACHD Master Street Map.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          2025

Right-of-Way Cost             $200,000

Construction Year           N/A

Construction Cost           $0

Project Manager                Christy Little

 

Project Name                        Developers Cooperative Projects (2021)

Project Description         Fund ACHD's share of roadway projects done in conjunction with private developers.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $300,000

Project Manager                Christy Little

 

Project Name                        Developers Cooperative Projects (2022)

Project Description         Fund ACHD's share of roadway projects done in conjunction with private developers.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $300,000

Project Manager                Christy Little

 

Project Name                        Developers Cooperative Projects (2023)

Project Description         Fund ACHD's share of roadway projects done in conjunction with private developers.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $300,000

Project Manager                Christy Little

 

Project Name                        Developers Cooperative Projects (2024)

Project Description         Fund ACHD's share of roadway projects done in conjunction with private developers.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $300,000

Project Manager                Christy Little

 

Project Name                        Developers Cooperative Projects (2025)

Project Description         Fund ACHD's share of roadway projects done in conjunction with private developers.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $300,000

Project Manager                Christy Little

 

Project Name                        St. Luke's Master Plan Transportation Component Implementation (2021)

Project Description         Payment to St. Luke's for implementation of cooperative projects constructed as per the three party development agreement between ACHD, City of Boise, and St. Luke's approved on March 30, 2016.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        Boise

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $1,500,000

Project Manager                Christy Little

 

Project Name                        St. Luke's Master Plan Transportation Component Implementation (2022)

Project Description         Payment to St. Luke's for implementation of cooperative projects constructed as per the three party development agreement between ACHD, City of Boise, and St. Luke's approved on March 30, 2016.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        Boise

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $1,500,000

Project Manager                Christy Little

 

Project Name                        St. Luke's Master Plan Transportation Component Implementation (2023)

Project Description         Payment to St. Luke's for implementation of cooperative projects constructed as per the three party development agreement between ACHD, City of Boise, and St. Luke's approved on March 30, 2016.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        Boise

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $1,500,000

Project Manager                Christy Little

 

Project Name                        St. Luke's Master Plan Transportation Component Implementation (2024)

Project Description         Payment to St. Luke's for implementation of cooperative projects constructed as per the three party development agreement between ACHD, City of Boise, and St. Luke's approved on March 30, 2016.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        Boise

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $1,500,000

Project Manager                Christy Little

 

Project Name                        St. Luke's Master Plan Transportation Component Implementation (2025)

Project Description         Payment to St. Luke's for implementation of cooperative projects constructed as per the three party development agreement between ACHD, City of Boise, and St. Luke's approved on March 30, 2016.

Project Program                Capital Investment Program     

Project Sub-Program      Cooperative

City Location                        Boise

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $1,500,000

Project Manager                Christy Little

 

Intersections

Project Name                        Amity Rd and Cloverdale Rd Roundabout

Project Description         Construct a multi-lane roundabout as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County

Design Year                             2023

Design Cost                             $100,000

Right-of-Way Year          2024

Right-of-Way Cost             $680,000

Construction Year           2025

Construction Cost           $3,170,000

Project Manager                Brian McCarthy

 

Project Name                        Amity Rd and Five Mile Rd

Project Description         Replace signalized intersection with a roundabout.  To be constructed as a Multi-lane Roundabout with 2-lanes for the northbound & southbound legs, 1-lane for the eastbound & westbound legs.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County

Design Year                             2025

Design Cost                             $405,000

Right-of-Way Year          Future

Right-of-Way Cost             $639,000

Construction Year           Future

Construction Cost           $3,217,000

Project Manager                Jason Tugby

 

Project Name                        Amity Rd and Locust Grove Rd Interim Signal

Project Description         Signalize the intersection with interim signal.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County, Meridian

Design Year                             2021

Design Cost                             $76,000

Right-of-Way Year          2021

Right-of-Way Cost             $67,000

Construction Year           2023

Construction Cost           $490,000

Project Manager                Ricardo Calderon

 

Project Name                        Amity Rd and Maple Grove Rd

Project Description         Replace intersection with a multi-lane roundabout with a westbound right-turn bypass lane. Includes bridge #1243.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County

Design Year                             2020

Design Cost                             $167,000

Right-of-Way Year          2021

Right-of-Way Cost             $438,000

Construction Year           2024-2025

Construction Cost           $3,578,000

Project Manager                Cody Homan

 

Project Name                        Cole Rd and Victory Rd

Project Description         Widen intersection to 7-lanes on all legs with median U-turns as per the 2016 CIP. Includes Cole, McGlochlin/Victory widening, an enhanced crossing at Diamond, and bridge #1261.  Carryover construction payments from FY20.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County, Boise

Design Year                             2018-2019

Design Cost                             $115,000

Right-of-Way Year          2019

Right-of-Way Cost             $3,116,000

Construction Year           2020-2021

Construction Cost           $4,497,000

Project Manager                Brian McCarthy

 

Project Name                        Eagle Rd and Amity Rd Roundabout (Dual Lane)

Project Description         Widen existing roundabout to a dual lane roundabout as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Meridian

Design Year                             2020

Design Cost                             $3,000

Right-of-Way Year          2020

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $3,066,000

Project Manager                Ryan Cutler

 

Project Name                        Eagle Rd and State St

Project Description         Construct a quadrant intersection and widen Eagle Road between Plaza and State to 4 lanes with center median as per the Eagle Rd and State St Intersection Concept Study.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Eagle

Design Year                             2020-2021

Design Cost                             $290,000

Right-of-Way Year          2021-2022

Right-of-Way Cost             $703,000

Construction Year           2023

Construction Cost           $7,157,000

Project Manager                Ryan Cutler

 

Project Name                        Fairview Ave and Locust Grove Rd

Project Description         Widen intersection to 9 lanes on Fairview Ave and 7 lanes on Locust Grove Rd, including concrete intersection, curb, gutter, sidewalk, and a Level 3 bike facility as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Meridian

Design Year                             2020-2021

Design Cost                             $387,000

Right-of-Way Year          2021-2022

Right-of-Way Cost             $2,071,000

Construction Year           2023

Construction Cost           $6,770,000

Project Manager                Brian McCarthy

 

Project Name                        Franklin Rd and McDermott Rd

Project Description         Construct a multi-lane roundabout at Franklin Rd and McDermott Rd.  Project includes the reconstruction/widening of approaches. Project cost excludes Canyon County's portion of the project cost.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County

Design Year                             2024

Design Cost                             $85,000

Right-of-Way Year          2025

Right-of-Way Cost             $640,000

Construction Year           Future

Construction Cost           $885,000

Project Manager                Ricardo Calderon

 

Project Name                        Lake Hazel Rd and Cloverdale Rd

Project Description         Widen intersection to 5 lanes on Lake Hazel Rd and 5 lanes on Cloverdale Rd as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County

Design Year                             2021

Design Cost                             $405,000

Right-of-Way Year          2023

Right-of-Way Cost             $476,000

Construction Year           2024

Construction Cost           $4,453,000

Project Manager                Chris Dayley

 

Project Name                        Lake Hazel Rd and Eagle Rd

Project Description         Widen and signalize intersection to 4/5 lanes on Eagle and 3/5 lanes on Lake Hazel as per the 2016 CIP. In-house design.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Meridian

Design Year                             2020

Design Cost                             $38,000

Right-of-Way Year          2021-2022

Right-of-Way Cost             $568,000

Construction Year           2022

Construction Cost           $7,754,000

Project Manager                Joe Tate

 

Project Name                        Lake Hazel Rd and Five Mile Rd

Project Description         Widen intersection to 6 lanes on Lake Hazel Rd and 5 lanes on Five Mile Rd as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County

Design Year                             2018-2019

Design Cost                             $122,000

Right-of-Way Year          2024

Right-of-Way Cost             $512,000

Construction Year           2025

Construction Cost           $2,529,000

Project Manager                Ryan Cutler

 

Project Name                        Lake Hazel Rd and Maple Grove Rd

Project Description         Widen intersection to 6-lanes on Lake Hazel Rd and 4-lanes on Maple Grove Rd as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County

Design Year                             2021

Design Cost                             $300,000

Right-of-Way Year          2022

Right-of-Way Cost             $648,000

Construction Year           2023

Construction Cost           $4,112,000

Project Manager                Jason Tugby

 

Project Name                        Linder Rd and Deer Flat Rd

Project Description         Improve the intersection of Linder Rd and Deer Flat Rd.  Includes curb, gutter, sidewalk and bike facilities.  Federal aid project. Carryover construction payments from FY20.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Kuna

Design Year                             2017-2018

Design Cost                             $78,000

Right-of-Way Year          2019

Right-of-Way Cost             $1,000

Construction Year           2020

Construction Cost           $563,000

Project Manager                Joe Tate

 

Project Name                        Linder Rd and Floating Feather Rd Roundabout

Project Description         Construct a multi-lane roundabout as per the 2016 CIP. To be built with the Linder Rd, State St (SH 44) / Floating Feather project.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Eagle

Design Year                             2020-2021

Design Cost                             $250,000

Right-of-Way Year          2021-2022

Right-of-Way Cost             $543,000

Construction Year           2024

Construction Cost           $3,259,000

Project Manager                Cody Homan

 

Project Name                        McMillan Rd and Black Cat Rd Interim Signal

Project Description         Signalize the intersection with interim signal.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County, Meridian

Design Year                             2021

Design Cost                             $51,000

Right-of-Way Year          2021

Right-of-Way Cost             $5,000

Construction Year           2022

Construction Cost           $344,000

Project Manager                Ricardo Calderon

 

Project Name                        Overland Rd and Eagle Rd

Project Description         Widen intersection to 7 lanes on Eagle Rd and 9 lanes on Overland Rd as per the 2016 CIP. Project to be done in coordination with the Idaho Transportation Department.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Meridian

Design Year                             2025

Design Cost                             $735,000

Right-of-Way Year          Future

Right-of-Way Cost             $1,610,000

Construction Year           Future

Construction Cost           $3,770,000

Project Manager                Ricardo Calderon

 

Project Name                        State St and Collister Dr

Project Description         Improve the intersection of State and Collister, including realignment of the Collister leg, curb, gutter, sidewalk, and bike lanes as per the State St TTOP and the 2016 CIP. Includes bridge #2038. Carryover irrigation work.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Boise

Design Year                             2016-2017

Design Cost                             $0

Right-of-Way Year          2018

Right-of-Way Cost             $358,000

Construction Year           2020

Construction Cost           $286,000

Project Manager                Ryan Cutler

 

Project Name                        State St and Glenwood St

Project Description         Widen intersection as per the State/Glenwood Intersection Concept Study, including median U-turns and improved bike and pedestrian crossings. Joint project with ITD.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Boise, Garden City

Design Year                             Future

Design Cost                             $1,270,000

Right-of-Way Year          Future

Right-of-Way Cost             $1,436,000

Construction Year           Future

Construction Cost           $14,494,000

Project Manager                Ricardo Calderon

 

Project Name                        State St and Pierce Park Ln

Project Description         Widen intersection to 4 lanes (Pierce Park) and 7 lanes (State), including sidewalk/buffered bike lane (north) and pathway (south), median and bus pullouts as per the State St TTOP.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Boise, Garden City

Design Year                             2018-2021

Design Cost                             $1,005,000

Right-of-Way Year          2021-2022

Right-of-Way Cost             $2,770,000

Construction Year           Future

Construction Cost           $7,098,000

Project Manager                Joe Tate

 

Project Name                        Ten Mile Rd and Amity Rd

Project Description         Construct a multi-lane roundabout. Project includes Ten Mile Bridge #1182. In-house design.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County

Design Year                             2018

Design Cost                             $0

Right-of-Way Year          2019-2020

Right-of-Way Cost             $355,000

Construction Year           2021

Construction Cost           $2,415,000

Project Manager                Brian McCarthy

 

Project Name                        Ten Mile Rd and Cherry Ln

Project Description         Widen intersection to 5/6 lanes on Ten Mile and 6/7 lanes on Cherry as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Meridian

Design Year                             2025

Design Cost                             $420,000

Right-of-Way Year          Future

Right-of-Way Cost             $760,000

Construction Year           Future

Construction Cost           $4,270,000

Project Manager                Ricardo Calderon

 

Project Name                        Ten Mile Rd and Columbia Rd

Project Description         Install a single-lane expandable roundabout as per the Ten Mile Corridor Intersection Analysis.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Kuna

Design Year                             Future

Design Cost                             $500,000

Right-of-Way Year          Future

Right-of-Way Cost             $103,000

Construction Year           Future

Construction Cost           $1,784,000

Project Manager                Seth Jarsky

 

Project Name                        Ten Mile Rd and Deer Flat Rd

Project Description         Install a single-lane expandable roundabout as per the Ten Mile Corridor Intersection Analysis.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Kuna

Design Year                             2021-2022

Design Cost                             $366,000

Right-of-Way Year          2023

Right-of-Way Cost             $328,000

Construction Year           2024

Construction Cost           $2,032,000

Project Manager                David Rader

 

Project Name                        Ten Mile Rd and Hubbard Rd

Project Description         Widen intersection or add roundabout as per the 2016 CIP. Traffic analysis should determine the ultimate lane configuration based on growth above projections in the area.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Kuna

Design Year                             2023

Design Cost                             $250,000

Right-of-Way Year          2024

Right-of-Way Cost             $43,000

Construction Year           Future

Construction Cost           $1,680,000

Project Manager                Joe Tate

 

Project Name                        Ten Mile Rd and Lake Hazel Rd

Project Description         Widen intersection to 3/4 lanes on Ten Mile and 3/4 lanes on Lake Hazel as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Kuna

Design Year                             2021

Design Cost                             $476,000

Right-of-Way Year          2023

Right-of-Way Cost             $291,000

Construction Year           Future

Construction Cost           $3,912,000

Project Manager                Joe Tate

 

Project Name                        Ten Mile Rd and Victory Rd

Project Description         Construct a multi-lane roundabout. Includes bridge #1181.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County

Design Year                             2019-2020

Design Cost                             $331,000

Right-of-Way Year          2020

Right-of-Way Cost             $158,000

Construction Year           2022-2023

Construction Cost           $3,374,000

Project Manager                Cody Homan

 

Project Name                        US 20/26 (Chinden Blvd) and Curtis Rd

Project Description         Widen the intersection to add a dedicated southbound through/right turn lane as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Garden City

Design Year                             2018

Design Cost                             $52,000

Right-of-Way Year          2019-2020

Right-of-Way Cost             $133,000

Construction Year           2021

Construction Cost           $1,277,000

Project Manager                Brian McCarthy

 

Project Name                        US 20/26 (Chinden Blvd) and Locust Grove Rd

Project Description         Widen Locust Grove legs of intersection in conjunction with ITD project. Carryover construction payments from FY2020.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Eagle, Meridian

Design Year                             2018-2019

Design Cost                             $0

Right-of-Way Year          2019

Right-of-Way Cost             $0

Construction Year           2020

Construction Cost           $20,000

Project Manager                Brian McCarthy

 

Project Name                        Ustick Rd and Black Cat Rd Interim Signal

Project Description         Install an interim traffic signal at Ustick Rd and Black Cat Rd.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County, Meridian

Design Year                             2020-2021

Design Cost                             $52,000

Right-of-Way Year          2021

Right-of-Way Cost             $4,000

Construction Year           2021

Construction Cost           $344,000

Project Manager                Jason Tugby

 

Project Name                        Victory Rd and Five Mile Rd

Project Description         Widen intersection to 6 lanes on Five Mile and 7 lanes on Victory as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Ada County, Boise

Design Year                             2024

Design Cost                             $280,000

Right-of-Way Year          2025

Right-of-Way Cost             $580,000

Construction Year           Future

Construction Cost           $2,790,000

Project Manager                Ricardo Calderon

 

Project Name                        Victory Rd and Locust Grove Rd Roundabout

Project Description         Construct a multi-lane roundabout as per the 2016 CIP. Includes bridge #2116. In-house design.

Project Program                Capital Investment Program     

Project Sub-Program      Intersections

City Location                        Meridian

Design Year                             2019-2020

Design Cost                             $102,000

Right-of-Way Year          2020-2021

Right-of-Way Cost             $654,000

Construction Year           2022

Construction Cost           $3,037,000

Project Manager                Ryan Cutler

 

Roads

Project Name                        Cloverdale Rd, Amity Rd / Victory Rd

Project Description         Widen Cloverdale Rd to 5 lanes with curb, gutter, sidewalk and raised bike lanes as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County

Design Year                             2023

Design Cost                             $783,000

Right-of-Way Year          2024

Right-of-Way Cost             $1,318,000

Construction Year           2025

Construction Cost           $7,736,000

Project Manager                Ricardo Calderon

 

Project Name                        Cloverdale Rd, Lake Hazel Rd / Amity Rd

Project Description         Widen Cloverdale Rd to 5 lanes with curb, gutter, sidewalk and raised bike lanes as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Boise

Design Year                             2023

Design Cost                             $340,000

Right-of-Way Year          2024

Right-of-Way Cost             $110,000

Construction Year           Future

Construction Cost           $2,360,000

Project Manager                Ricardo Calderon

 

Project Name                        Cloverdale Rd, Victory Rd / Overland Rd

Project Description         Widen Cloverdale Rd to 5 lanes with curb, gutter, sidewalk and raised bike lanes from Victory Rd to Overland Rd per the 2016 CIP. Includes restriping of Overland intersection.  In-house design.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Boise

Design Year                             2021

Design Cost                             $90,000

Right-of-Way Year          2022-2023

Right-of-Way Cost             $1,075,000

Construction Year           2025

Construction Cost           $6,807,000

Project Manager                David Rader

 

Project Name                        Eagle Rd, Amity Rd / Victory Rd

Project Description         Widen to 5 lanes with curb, gutter, sidewalk and a Level 3 bike facility as per the 2016 CIP. Includes an enhanced crossing at Rome and a roundabout at Eagle and Zaldia. In-house design.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2018

Design Cost                             $8,000

Right-of-Way Year          2019-2020

Right-of-Way Cost             $315,000

Construction Year           2021

Construction Cost           $5,092,000

Project Manager                Ryan Cutler

 

Project Name                        Eagle Rd, Lake Hazel Rd / Amity Rd

Project Description         Widen Eagle Rd to 5 lanes with curb, gutter, sidewalk and a Level 3 bike facility from Lake Hazel Rd to Amity Rd as per the 2016 CIP and Bike Master Plan.  Includes a roundabout at Eagle Rd and Taconic Dr.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2021

Design Cost                             $406,000

Right-of-Way Year          2022

Right-of-Way Cost             $1,324,000

Construction Year           2023

Construction Cost           $5,242,000

Project Manager                Brian McCarthy

 

Project Name                        Fairview Ave, Locust Grove Rd / SH 55 (Eagle Rd)

Project Description         Widen Fairview Ave to 7 lanes with curb, gutter, sidewalk, and buffered bike lanes as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2020-2021

Design Cost                             $223,000

Right-of-Way Year          2021-2022

Right-of-Way Cost             $649,000

Construction Year           2023

Construction Cost           $2,180,000

Project Manager                Brian McCarthy

 

Project Name                        Five Mile Rd, Amity Rd / Victory Rd

Project Description         Widen Five Mile to 5 lanes with curb, gutter, sidewalk, and a Level 2 bike facility as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County

Design Year                             2025

Design Cost                             $331,000

Right-of-Way Year          Future

Right-of-Way Cost             $371,000

Construction Year           Future

Construction Cost           $3,088,000

Project Manager                Ryan Cutler

 

Project Name                        Five Mile Rd, Lake Hazel Rd / Amity Rd

Project Description         Widen Five Mile Rd to 5 lanes, with curb, gutter, sidewalk, and bike lane as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County

Design Year                             2024-2025

Design Cost                             $380,000

Right-of-Way Year          Future

Right-of-Way Cost             $782,000

Construction Year           Future

Construction Cost           $3,380,000

Project Manager                Ryan Cutler

 

Project Name                        Five Mile Rd, Overland Rd / Franklin Rd

Project Description         Reconstruct/widen from 2-lanes to 5-lanes.  Project costs do not include any work associated with the ITD Overpass.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Boise

Design Year                             2023

Design Cost                             $1,204,000

Right-of-Way Year          2024-2025

Right-of-Way Cost             $1,131,000

Construction Year           Future

Construction Cost           $10,203,000

Project Manager                Joe Tate

 

Project Name                        Lake Hazel Rd, Cloverdale Rd / Five Mile Rd

Project Description         Widen Lake Hazel Rd to 5 lanes with curb, gutter and multi-use pathways from Cloverdale Rd to Five Mile Rd as per the 2016 CIP and Bike Master Plan.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County

Design Year                             2021

Design Cost                             $466,000

Right-of-Way Year          2022-2023

Right-of-Way Cost             $1,207,000

Construction Year           2025

Construction Cost           $4,993,000

Project Manager                Ryan Cutler

 

Project Name                        Lake Hazel Rd, Eagle Rd / Cloverdale Rd

Project Description         Widen Lake Hazel Rd to 5 lanes with curb, gutter and multi-use pathways from Eagle Rd to Cloverdale Rd as per the 2016 CIP and Bike Master Plan.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County

Design Year                             2022

Design Cost                             $375,000

Right-of-Way Year          2023

Right-of-Way Cost             $205,000

Construction Year           2024

Construction Cost           $7,606,000

Project Manager                Seth Jarsky

 

Project Name                        Lake Hazel Rd, Five Mile Rd / Maple Grove Rd

Project Description         Widen Lake Hazel Rd to 5 lanes with curb, gutter, and multi-use pathways as per the 2016 CIP and Bike Master Plan.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County

Design Year                             2022

Design Cost                             $416,000

Right-of-Way Year          2023

Right-of-Way Cost             $251,000

Construction Year           Future

Construction Cost           $4,222,000

Project Manager                Ryan Cutler

 

Project Name                        Lake Hazel Rd, Maple Grove Rd / Cole Rd

Project Description         Widen Lake Hazel Rd to 5 lanes with curb, gutter, and multi-use pathways as per the 2016 CIP and Bike Master Plan.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County

Design Year                             2022

Design Cost                             $332,000

Right-of-Way Year          2023

Right-of-Way Cost             $64,000

Construction Year           Future

Construction Cost           $3,665,000

Project Manager                Jason Tugby

 

Project Name                        Linder Rd, Cherry Ln / Ustick Rd

Project Description         Widen Linder Rd to 5 lanes with curb, gutter, sidewalk, and Level 2 bike facilities as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2025

Design Cost                             $550,000

Right-of-Way Year          Future

Right-of-Way Cost             $1,800,000

Construction Year           Future

Construction Cost           $4,397,000

Project Manager                Joe Tate

 

Project Name                        Linder Rd, Chinden Blvd (US 20/26) / SH 44 (State St) - South Phase

Project Description         Widen roadway to 5 lanes with detached multi-use pathways on Linder Rd, from Chinden Blvd to 1,000' N/O Artesian Rd. Right-of-way acquisition will be for the ultimate 7-lanes. The South Phase includes bridges #1078, #2033, and #2034.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County

Design Year                             2024-2025

Design Cost                             $1,396,000

Right-of-Way Year          Future

Right-of-Way Cost             $1,656,000

Construction Year           Future

Construction Cost           $17,855,000

Project Manager                Cody Homan

 

Project Name                        Linder Rd, Franklin Rd / Pine Ave

Project Description         Widen Linder Rd to 5 lanes with curb, gutter, sidewalk and bike lanes from Franklin Rd to Pine Ave as per the 2016 CIP. Project includes bridge #1120. The UPRR crossing is being upgraded under a separate project concurrently. Carryover construction payment from FY2020.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2017-2018

Design Cost                             $34,000

Right-of-Way Year          2019

Right-of-Way Cost             $89,000

Construction Year           2020

Construction Cost           $828,000

Project Manager                David Rader

 

Project Name                        Linder Rd, Overland Rd / Franklin Rd

Project Description         Widen Linder Rd to 5 lanes and construct a new 4-lane I-84 overpass, including curb, gutter, sidewalk, and bike lanes as per the 2016 CIP. Project would be a joint project between ACHD and ITD.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             Future

Design Cost                             $1,181,000

Right-of-Way Year          Future

Right-of-Way Cost             $1,924,000

Construction Year           Future

Construction Cost           $13,612,000

Project Manager                Ryan Head

 

Project Name                        Linder Rd, SH 44 (State St) / Floating Feather Rd

Project Description         Widen to 5 lanes, with curb, gutter, and multi-use pathways as per the 2016 CIP. Includes bridges #1021 and #1022.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Eagle

Design Year                             2020-2021

Design Cost                             $408,000

Right-of-Way Year          2021-2022

Right-of-Way Cost             $945,000

Construction Year           2024

Construction Cost           $6,352,000

Project Manager                Cody Homan

 

Project Name                        Locust Grove Rd, Victory Rd / Overland Rd

Project Description         Widen to 5 lanes with curb, gutter, sidewalk and a Level 2 bike facility as per the 2016 CIP. Includes enhanced crossing at Time Zone Dr and bridge #2087.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2019

Design Cost                             $62,000

Right-of-Way Year          2020-2021

Right-of-Way Cost             $808,000

Construction Year           2022

Construction Cost           $5,335,000

Project Manager                Ryan Cutler

 

Project Name                        Maple Grove Rd, Amity Rd / Victory Rd

Project Description         Widen to 5 lanes with curb, gutter, sidewalk, and Level 2 bike facility as per the 2016 CIP. Includes bridges #1239.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County

Design Year                             2021

Design Cost                             $546,000

Right-of-Way Year          2022-2023

Right-of-Way Cost             $2,474,000

Construction Year           2024-2025

Construction Cost           $7,080,000

Project Manager                Cody Homan

 

Project Name                        Maple Grove Rd, Lake Hazel Rd / Amity Rd

Project Description         Widen Maple Grove Rd to 5-lanes with curb, gutter, sidewalk, and a Level 3 bike facility as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County

Design Year                             2024

Design Cost                             $500,000

Right-of-Way Year          2025-2026

Right-of-Way Cost             $1,846,000

Construction Year           Future

Construction Cost           $5,990,000

Project Manager                Cody Homan

 

Project Name                        Maple Grove Rd, Victory Rd / Overland Rd

Project Description         Widen to 5 lanes with curb, gutter, sidewalk, and a Level 2 bike facility as per the 2016 CIP. Includes bridges #1237, #1238, and #1242 and enhanced crossings at Targee and Maple Grove Elementary.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Boise

Design Year                             2018

Design Cost                             $116,000

Right-of-Way Year          2019-2020

Right-of-Way Cost             $1,088,000

Construction Year           2021

Construction Cost           $8,010,000

Project Manager                Ryan Cutler

 

Project Name                        Meridian Rd, Cherry Ln / Ustick Rd

Project Description         Widen to 5 lanes with curb, gutter, sidewalk, and bike lanes as per the 2016 CIP. Includes bridges #2045 and #126X and enhanced crossings at James and Woodbury. Carryover const payments from FY20.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2016-2017

Design Cost                             $118,000

Right-of-Way Year          2018-2019

Right-of-Way Cost             $318,000

Construction Year           2020

Construction Cost           $3,187,000

Project Manager                Brian McCarthy

 

Project Name                        Meridian Rd, McMillan Rd / US 20/26 (Chinden Blvd)

Project Description         Reconstruct/widen from 2-lanes to 3-lanes.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2023

Design Cost                             $290,000

Right-of-Way Year          2024

Right-of-Way Cost             $190,000

Construction Year           Future

Construction Cost           $2,880,000

Project Manager                Ryan Head

 

Project Name                        Meridian Rd, Ustick Rd / McMillan Rd

Project Description         Widen Meridian Rd to 3 lanes with curb, gutter, sidewalk, and Level 3 bike facility as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2023

Design Cost                             $182,000

Right-of-Way Year          2024

Right-of-Way Cost             $213,000

Construction Year           Future

Construction Cost           $1,451,000

Project Manager                Ricardo Calderon

 

Project Name                        Orchard St Realignment, Gowen Rd / Victory Rd

Project Description         Realign/widen Orchard St to 5 lanes with curb, gutter, sidewalk, and a Level 3 bike facility as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Boise

Design Year                             2019-2021

Design Cost                             $778,000

Right-of-Way Year          2022-2023

Right-of-Way Cost             $1,380,000

Construction Year           2024

Construction Cost           $17,232,000

Project Manager                David Rader

 

Project Name                        State St, 36th St / 27th St

Project Description         Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk, and bike lanes as per the State St TTOP and the 2016 CIP.  This project may include an access management component.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Boise

Design Year                             Future

Design Cost                             $370,000

Right-of-Way Year          Future

Right-of-Way Cost             $720,000

Construction Year           Future

Construction Cost           $4,484,000

Project Manager                Ricardo Calderon

 

Project Name                        State St, Collister Dr / 36th St

Project Description         Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk, and bike lanes as per the State St TTOP and the 2016 CIP.  This project may include an access management component.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Boise

Design Year                             Future

Design Cost                             $280,000

Right-of-Way Year          Future

Right-of-Way Cost             $540,000

Construction Year           Future

Construction Cost           $12,400,000

Project Manager                Ricardo Calderon

 

Project Name                        State St, Pierce Park Ln / Collister Dr

Project Description         Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk, and bike lanes as per the State St TTOP and the 2016 CIP.  This project may include an access management component.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Boise, Garden City

Design Year                             Future

Design Cost                             $520,000

Right-of-Way Year          Future

Right-of-Way Cost             $710,000

Construction Year           Future

Construction Cost           $6,452,000

Project Manager                Ricardo Calderon

 

Project Name                        Ten Mile Rd, McMillan Rd / Chinden Blvd (US 20/26)

Project Description         Widen Ten Mile Rd to 5 lanes with curb, gutter, sidewalk and bike lanes as per the 2016 CIP. Includes an enhanced pedestrian crossing at Malta. In-house design. To be built by development under a STARS agreement.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2018

Design Cost                             $0

Right-of-Way Year          2019

Right-of-Way Cost             $781,000

Construction Year           2020

Construction Cost           $2,028,000

Project Manager                David Rader

 

Project Name                        Ten Mile Rd, Ustick Rd / McMillan Rd

Project Description         Widen to 5 lanes with curb, gutter, sidewalk and bike lanes as per the 2016 CIP. Includes bridges #1103 and #2044, enhanced crossings at Tesino and the pedestrian path south of Vicenza, parking area for Meridian Pathway (Cost share with the City of Meridian).

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2018-2019

Design Cost                             $81,000

Right-of-Way Year          2019

Right-of-Way Cost             $745,000

Construction Year           2020

Construction Cost           $3,002,000

Project Manager                David Rader

 

Project Name                        Ten Mile Rd, Victory Rd / Overland Rd

Project Description         Widen to 5 lanes with curb, gutter, sidewalk and a Level 3 bike facility as per the 2016 CIP. In-house design.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County, Meridian

Design Year                             2019

Design Cost                             $37,000

Right-of-Way Year          2020-2021

Right-of-Way Cost             $155,000

Construction Year           2022-2023

Construction Cost           $2,988,000

Project Manager                Cody Homan

 

Project Name                        Ustick Rd, Ten Mile Rd / Linder Rd

Project Description         Widen Ustick Rd to 5 lanes with curb, gutter, sidewalk, and Level 3 bike facility as per the 2016 CIP. Concept design will further clarify project scope.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2022

Design Cost                             $392,000

Right-of-Way Year          2023

Right-of-Way Cost             $140,000

Construction Year           2025

Construction Cost           $3,185,000

Project Manager                Joe Tate

 

Project Name                        Victory Rd, Cloverdale Rd / Five Mile Rd

Project Description         Widen Victory Rd to 5 lanes with curb, gutter, sidewalk and bike lanes as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County, Boise

Design Year                             2023

Design Cost                             $328,000

Right-of-Way Year          2024

Right-of-Way Cost             $480,000

Construction Year           Future

Construction Cost           $4,171,000

Project Manager                Ricardo Calderon

 

Project Name                        Victory Rd, Eagle Rd / Cloverdale Rd

Project Description         Widen Victory Rd to 5 lanes with curb, gutter, sidewalk, and bike lane as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County, Boise, Meridian

Design Year                             2023

Design Cost                             $330,000

Right-of-Way Year          2024

Right-of-Way Cost             $340,000

Construction Year           Future

Construction Cost           $3,320,000

Project Manager                Ricardo Calderon

 

Project Name                        Victory Rd, Five Mile Rd / Maple Grove Rd

Project Description         Widen Victory Rd to 5 lanes with curb, gutter, sidewalk and bike lanes as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County, Boise

Design Year                             2025

Design Cost                             $246,000

Right-of-Way Year          Future

Right-of-Way Cost             $273,000

Construction Year           Future

Construction Cost           $3,820,000

Project Manager                Ryan Head

 

Project Name                        Victory Rd, Locust Grove Rd / Eagle Rd

Project Description         Widen Victory Rd to 3 lanes with curb, gutter, sidewalk, and bike lanes as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2023

Design Cost                             $372,000

Right-of-Way Year          2024

Right-of-Way Cost             $150,000

Construction Year           Future

Construction Cost           $4,741,000

Project Manager                Ricardo Calderon

 

Project Name                        Victory Rd, Maple Grove Rd / Cole Rd

Project Description         Widen Victory Rd to 5 lanes with curb, gutter, sidewalk and bike lanes as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Ada County, Boise

Design Year                             2025

Design Cost                             $164,000

Right-of-Way Year          Future

Right-of-Way Cost             $180,000

Construction Year           Future

Construction Cost           $2,338,000

Project Manager                Ricardo Calderon

 

Project Name                        Victory Rd, SH 69 (Meridian Rd) / Locust Grove Rd

Project Description         Widen Victory Rd to 3 lanes with curb, gutter, sidewalk, and level 3 bike facility as per the 2016 CIP.

Project Program                Capital Investment Program     

Project Sub-Program      Roads

City Location                        Meridian

Design Year                             2023

Design Cost                             $310,000

Right-of-Way Year          2024

Right-of-Way Cost             $240,000

Construction Year           2025

Construction Cost           $3,090,000

Project Manager                Ricardo Calderon

 

Capital Maintenance Program

Federal Projects

Project Name                        Federal Aid Capital Maintenance (2017)

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        Ada County, Boise, Meridian

Design Year                             N/A

Design Cost                             $25,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2018-2019

Construction Cost           $0

Project Manager                Joe Tate

 

Project Name                        Federal Aid Capital Maintenance (2021) - Phase 1

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        Boise

Design Year                             2019-2020

Design Cost                             $203,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $4,929,000

Project Manager                Brian McCarthy

 

Project Name                        Federal Aid Capital Maintenance (2021) - Phase 2

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        Boise

Design Year                             2019-2020

Design Cost                             $185,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $2,120,000

Project Manager                Joe Tate

 

Project Name                        Federal Aid Capital Maintenance (2021) - Phase 3

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program. Includes improvement to storm drain infrastructure.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        Boise

Design Year                             2019-2020

Design Cost                             $88,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $616,000

Project Manager                David Rader

 

Project Name                        Pavement Preservation & ADA (2022) - Phase 1

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Project supplemented with federal-aid.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        Boise

Design Year                             2020

Design Cost                             $384,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $5,427,000

Project Manager                Brian McCarthy

 

Project Name                        Pavement Preservation & ADA (2022) - Phase 2

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Project supplemented with federal-aid.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        Boise

Design Year                             2020

Design Cost                             $74,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $2,326,000

Project Manager                Brian McCarthy

 

Project Name                        Pavement Preservation & ADA (2022) - Phase 3

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Eligible for federal-aid.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        Boise

Design Year                             2020

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $300,000

Project Manager                Ryan Cutler

 

Project Name                        Roadway and ADA Improvements (2023) - Part 1

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Project supplemented with federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2021

Design Cost                             $538,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $5,379,000

Project Manager                Seth Jarsky

 

Project Name                        Roadway and ADA Improvements (2023) - Part 2

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Project supplemented with federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2021

Design Cost                             $231,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $2,268,000

Project Manager                Chris Dayley

 

Project Name                        Roadway and ADA Improvements (2023) - Part 3

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Eligible for federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2021

Design Cost                             $80,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $300,000

Project Manager                Seth Jarsky

 

Project Name                        Roadway and ADA Improvements (2024) - Part 1

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Project supplemented with federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2022

Design Cost                             $516,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $5,157,000

Project Manager                Ryan Cutler

 

Project Name                        Roadway and ADA Improvements (2024) - Part 2

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Project supplemented with federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2022

Design Cost                             $221,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $2,210,000

Project Manager                Cody Homan

 

Project Name                        Roadway and ADA Improvements (2024) - Part 3

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Eligible for federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2022

Design Cost                             $80,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $300,000

Project Manager                Brian McCarthy

 

Project Name                        Roadway and ADA Improvements (2025) - Part 1

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Project supplemented with federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2023

Design Cost                             $501,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $5,010,000

Project Manager                Ricardo Calderon

 

Project Name                        Roadway and ADA Improvements (2025) - Part 2

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Project supplemented with federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2023

Design Cost                             $215,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $2,147,000

Project Manager                Ricardo Calderon

 

Project Name                        Roadway and ADA Improvements (2025) - Part 3

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Eligible for federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2023

Design Cost                             $80,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $300,000

Project Manager                Ricardo Calderon

 

Project Name                        Roadway and ADA Improvements (2026) - Part 1

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Project supplemented with federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2024

Design Cost                             $501,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2026

Construction Cost           $5,010,000

Project Manager                Ricardo Calderon

 

Project Name                        Roadway and ADA Improvements (2026) - Part 2

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Project supplemented with federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2024

Design Cost                             $215,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2026

Construction Cost           $2,156,000

Project Manager                Ricardo Calderon

 

Project Name                        Roadway and ADA Improvements (2026) - Part 3

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program.  Eligible for federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2024

Design Cost                             $80,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2026

Construction Cost           $300,000

Project Manager                Ricardo Calderon

 

Project Name                        Roadway and ADA Improvements (2027) - Part 1

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program. Project supplemented with federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2025

Design Cost                             $504,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2027

Construction Cost           $5,010,000

Project Manager                Ricardo Calderon

 

Project Name                        Roadway and ADA Improvements (2027) - Part 2

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program. Project supplemented with federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2025

Design Cost                             $216,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2027

Construction Cost           $2,147,000

Project Manager                Ricardo Calderon

 

Project Name                        Roadway and ADA Improvements (2027) - Part 3

Project Description         Pavement rehabilitation and upgrade of adjacent pedestrian ramps on identified arterial and collector road segments. Projects selected as part of ACHD's Pavement Management Program. Eligible for federal-aid.  Location TBD.

Project Program                Capital Maintenance Program 

Project Sub-Program      Federal

City Location                        To Be Determined

Design Year                             2025

Design Cost                             $80,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2027

Construction Cost           $300,000

Project Manager                Ricardo Calderon

 

Local Projects

Project Name                        11th St Maintenance and Bikeway, State St / Heron St

Project Description         Complete roadway maintenance on 11th St, from Fort St to Heron St and implement the 11th St Bikeway (State to Heron). Includes enhanced pedestrian crossings (RRFB) at Fort and 11th, Hays and 11th, and Hays and 12th.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Boise

Design Year                             2020-2021

Design Cost                             $82,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $1,540,000

Project Manager                David Rader

 

Project Name                        Arterial & Collector Capital Maintenance (2021) - HB312 Project

Project Description         Pavement rehabilitation and pedestrian ramps on identified arterial and collector roads as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding. In-house design.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Ada County

Design Year                             2020

Design Cost                             $23,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $2,200,000

Project Manager                Chris Dayley

 

Project Name                        Arterial & Collector Capital Maintenance (2022) - HB312 Project

Project Description         Pavement rehabilitation and pedestrian ramps on identified arterial and collector roads as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding. In-house design.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Ada County, Kuna, Meridian

Design Year                             2021

Design Cost                             $50,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $1,138,000

Project Manager                Chris Dayley

 

Project Name                        Arterial & Collector Capital Maintenance (2023) - HB312 Project

Project Description         Pavement rehabilitation and pedestrian ramps on identified arterial and collector roads as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding. In-house design.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        To Be Determined

Design Year                             2022

Design Cost                             $110,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $1,200,000

Project Manager                Jason Tugby

 

Project Name                        Arterial & Collector Capital Maintenance (2024) - HB312 Project

Project Description         Pavement rehabilitation and pedestrian ramps on identified arterial and collector roads as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding. In-house design.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        To Be Determined

Design Year                             2023

Design Cost                             $150,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $1,359,000

Project Manager                Scott Forrey

 

Project Name                        Arterial & Collector Capital Maintenance (2025) - HB312 Project

Project Description         Pavement rehabilitation and pedestrian ramps on identified arterial and collector roads as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding. In-house design.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        To Be Determined

Design Year                             2023

Design Cost                             $220,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $2,000,000

Project Manager                Scott Forrey

 

Project Name                        Arterial & Collector Capital Maintenance (2026) - HB312 Project

Project Description         Pavement rehabilitation and pedestrian ramps on identified arterial and collector roads as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding. In-house design.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        To Be Determined

Design Year                             2024

Design Cost                             $220,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           Future

Construction Cost           $2,000,000

Project Manager                Scott Forrey

 

Project Name                        Bannock St Maintenance and Bikeway, Broadway Ave / Greenbelt

Project Description         Complete roadway maintenance on Bannock St, from the flume to Coston St and implement the Bannock St Bikeway (East Phase).

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Boise

Design Year                             2022

Design Cost                             $75,000

Right-of-Way Year          N/A

Right-of-Way Cost             $3,000

Construction Year           2024

Construction Cost           $617,000

Project Manager                Joe Tate

 

Project Name                        Capital Maintenance Enhancement Set-Aside

Project Description         Funding set-aside for maintenance project enhancements. May be used for interim pedestrian facilities, ADA sidewalk repairs, drainage improvements, enhanced crossings identified in a plan, bikeway signage, or minor pavement widening to add turn lanes.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           N/A

Construction Cost           $1,200,000

Project Manager                Ricardo Calderon

 

Project Name                        Cul-de-Sac (2021) - HB312 Project

Project Description         Rehabilitate cul-de-sacs in Maintenance Zone 2 as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Ada County, Boise, Kuna, Meridian

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $541,000

Project Manager                David Rader

 

Project Name                        Cul-de-Sac (2023) - HB312 Project

Project Description         Rehabilitate cul-de-sacs in Maintenance Zone 4 as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Boise

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $400,000

Project Manager                Scott Forrey

 

Project Name                        Cul-de-Sac (2024) - HB312 Project

Project Description         Rehabilitate cul-de-sacs in Maintenance Zone 5 as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Ada County, Boise, Garden City

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $400,000

Project Manager                Scott Forrey

 

Project Name                        Cul-de-Sac (2025) - HB312 Project

Project Description         Rehabilitate cul-de-sacs in Maintenance Zone 6 as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Ada County, Boise, Eagle, Meridian, Star

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $400,000

Project Manager                Scott Forrey

 

Project Name                        Cul-de-Sac Reconstruct (2023)

Project Description         Reconstruct cul-de-sacs in Maintenance Zone 4 as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Boise

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $400,000

Project Manager                Scott Forrey

 

Project Name                        Cul-de-Sac Reconstruct (2024) - HB312 Project

Project Description         Reconstruct cul-de-sacs in Maintenance Zone 5 as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Ada County, Boise, Garden City

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $400,000

Project Manager                Scott Forrey

 

Project Name                        Cul-de-Sac Reconstruct (2025) - HB312 Project

Project Description         Reconstruct cul-de-sacs in Maintenance Zone 6 as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Ada County, Boise, Eagle, Meridian, Star

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $400,000

Project Manager                Scott Forrey

 

Project Name                        Downtown Boise Implementation (2019) - HB312 Project

Project Description         Rehabilitate select streets in downtown Boise as per the Downtown Boise Implementation Plan. Includes an accessible pedestrian signal at 16th St and Idaho St. Project funded through House Bill 312 funding. Carryover from FY2019 construction project.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Boise

Design Year                             2018

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2020-2021

Construction Cost           $164,000

Project Manager                Cody Homan

 

Project Name                        Downtown Boise Implementation (2020) - HB312 Project

Project Description         Perform road rehabilitation of select streets in downtown Boise in concert with CCDC and other projects as per the Downtown Boise Implementation Plan. Project funded through House Bill 312 funding. Includes enhanced pedestrian crossings at State and 12th and at State and 14th.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Boise

Design Year                             2020-2021

Design Cost                             $726,000

Right-of-Way Year          2020

Right-of-Way Cost             $0

Construction Year           2021-2022

Construction Cost           $5,574,000

Project Manager                Cody Homan

 

Project Name                        Maintenance Crack Seal (2020) - HB312 Project

Project Description         Seal cracks in arterial and collector roadways in Preventative Maintenance Zone 3 as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Ada County, Boise, Kuna, Meridian

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2020-2021

Construction Cost           $321,000

Project Manager                Seth Jarsky

 

Project Name                        Maintenance Crack Seal (2021) - HB312 Project

Project Description         Seal cracks in arterial and collector roadways in Preventative Maintenance Zone 4 as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Boise

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $405,000

Project Manager                Chris Dayley

 

Project Name                        Maintenance Crack Seal (2022) - HB312 Project

Project Description         Seal cracks in arterial and collector roadways in Preventative Maintenance Zone 5 as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Ada County, Boise, Garden City

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $325,000

Project Manager                Jason Tugby

 

Project Name                        Maintenance Crack Seal (2023) - HB312 Project

Project Description         Seal cracks in arterial and collector roadways in Preventative Maintenance Zone 6 as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Ada County, Boise, Eagle, Meridian, Star

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $325,000

Project Manager                Scott Forrey

 

Project Name                        Maintenance Crack Seal (2024) - HB312 Project

Project Description         Seal cracks in arterial and collector roadways in Preventative Maintenance Zone 1 as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Boise, Garden City

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $325,000

Project Manager                Scott Forrey

 

Project Name                        Maintenance Crack Seal (2025) - HB312 Project

Project Description         Seal cracks in arterial and collector roadways in Preventative Maintenance Zone 2 as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Ada County, Boise, Kuna, Meridian

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $325,000

Project Manager                Scott Forrey

 

Project Name                        Microseal (2021) - HB312 Project

Project Description         Microseal roadways as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $650,000

Project Manager                Brian McCarthy

 

Project Name                        Residential Capital Maintenance (2020) - HB312 Project

Project Description         Pavement rehabilitation and pedestrian ramps on residential streets identified as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding. In-house design.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Boise

Design Year                             2019

Design Cost                             $12,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2020-2021

Construction Cost           $246,000

Project Manager                Cody Homan

 

Project Name                        Residential Capital Maintenance (2022) - HB312 Project

Project Description         Pavement rehabilitation and pedestrian ramps on residential streets identified as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding. In-house design.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Meridian

Design Year                             2020

Design Cost                             $41,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $4,968,000

Project Manager                Ryan Cutler

 

Project Name                        Residential Capital Maintenance (2023) - HB312 Project

Project Description         Pavement rehabilitation and pedestrian ramps on residential streets identified as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding. In-house design.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        Ada County, Boise, Meridian

Design Year                             2021

Design Cost                             $110,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $5,420,000

Project Manager                Seth Jarsky

 

Project Name                        Residential Capital Maintenance (2024) - HB312 Project

Project Description         Pavement rehabilitation and pedestrian ramps on residential streets identified as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        To Be Determined

Design Year                             2022

Design Cost                             $110,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $5,303,000

Project Manager                Jason Tugby

 

Project Name                        Residential Capital Maintenance (2025) - HB312 Project

Project Description         Pavement rehabilitation and pedestrian ramps on residential streets identified as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        To Be Determined

Design Year                             2023

Design Cost                             $597,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $5,503,000

Project Manager                Scott Forrey

 

Project Name                        Residential Capital Maintenance (2026) - HB312 Project

Project Description         Pavement rehabilitation and pedestrian ramps on residential streets identified as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        To Be Determined

Design Year                             2024

Design Cost                             $693,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2026

Construction Cost           $6,500,000

Project Manager                Scott Forrey

 

Project Name                        Residential Capital Maintenance (2027) - HB312 Project

Project Description         Pavement rehabilitation and pedestrian ramps on residential streets identified as part of ACHD's Pavement Management Program. Project funded through House Bill 312 funding.

Project Program                Capital Maintenance Program 

Project Sub-Program      Local

City Location                        To Be Determined

Design Year                             2025

Design Cost                             $693,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2027

Construction Cost           $6,500,000

Project Manager                Scott Forrey

 

Community Programs

Bikeways

Project Name                        Bannock St Bikeway (West Phase), Whitewater Park Blvd / Ave C

Project Description         Improve Bannock St as a low-stress bikeway to include wayfinding and bikeway signage, enhanced crossings, and markings as per the Bike Master Plan.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise

Design Year                             Future

Design Cost                             $25,000

Right-of-Way Year          Future

Right-of-Way Cost             $2,000

Construction Year           Future

Construction Cost           $205,000

Project Manager                Ryan Head

 

Project Name                        Bikeway Signage (2021) - Phase 1

Project Description         Install wayfinding and bikeway signage on along identified bikeways as per the Bike Master Plan. Includes the Columbus St Bikeway, Canal St Bikeway, and the Latah St Bikeway.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $80,000

Project Manager                Edinson Bautista

 

Project Name                        Bikeway Signage (2021) - Phase 2

Project Description         Install wayfinding and bikeway signage on along identified bikeways as per the Bike Master Plan. Includes the Northwest Boise Bikeway and the Bloom St Bikeway.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $120,000

Project Manager                Edinson Bautista

 

Project Name                        Bikeway Signage (2022)

Project Description         Install wayfinding and bikeway signage on along identified bikeways as per the Bike Master Plan. Includes Breneman St, 23rd St, 18th St, Ellis St, Ressiguie St, Pleasanton St, Main St-Fairview Ave, Protest Hill Bikeway, and Orchard Hill Bikeway.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise, Garden City

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $200,000

Project Manager                Edinson Bautista

 

Project Name                        Bikeway Signage (2023)

Project Description         Install wayfinding and bikeway signage on along identified bikeways as per the Bike Master Plan. Includes the Chinden-McMillan Bikeway (Phase 1), Bennington Way / Mitchell St and the Mitchell St Bikeway.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $200,000

Project Manager                Edinson Bautista

 

Project Name                        Bikeway Signage (2024)

Project Description         Install wayfinding and bikeway signage on along identified bikeways as per the Bike Master Plan. Includes the Records St Bikeway, Granger St Bikeway, and McMillan-Ustick Bikeway (Phases 1 & 2).

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise, Meridian

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $200,000

Project Manager                Edinson Bautista

 

Project Name                        Bikeway Signage (2025)

Project Description         Install wayfinding and bikeway signage on along identified bikeways as per the Bike Master Plan. Includes the Manitou Ave Bikeway and the 43rd St Bikeway Connection.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise, Garden City

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $200,000

Project Manager                Edinson Bautista

 

Project Name                        Columbia Village Bikeway, Hwy 21 / Boise Ave

Project Description         Improve select streets (Holcomb, Yamhill, Lake Forest, Grand Forest) in Columbia Village as a bikeway to include wayfinding, signage, crossings, and markings as per the Bike Master Plan.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise

Design Year                             2023

Design Cost                             $50,000

Right-of-Way Year          2023

Right-of-Way Cost             $3,000

Construction Year           2024

Construction Cost           $192,000

Project Manager                Seth Jarsky

 

Project Name                        Franklin St Bikeway, Resseguie St / Bannock St

Project Description         Improve Franklin St as a bikeway to include wayfinding, signage, crossings, connection through Fort Boise and markings as per the Bike Master Plan.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise

Design Year                             2023-2024

Design Cost                             $50,000

Right-of-Way Year          2024

Right-of-Way Cost             $2,000

Construction Year           2025

Construction Cost           $202,000

Project Manager                Ryan Head

 

Project Name                        Garden St Bikeway, Albion St / Greenbelt

Project Description         Improve Garden St as a bikeway to include wayfinding and bikeway signage, enhanced crossing at Franklin Rd, and markings as per the Bike Master Plan and the Central Bench Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise

Design Year                             2024

Design Cost                             $25,000

Right-of-Way Year          2024

Right-of-Way Cost             $2,000

Construction Year           2025

Construction Cost           $162,000

Project Manager                Ryan Head

 

Project Name                        Hollandale-Targee Bikeway, Locust Grove Rd / Targee St

Project Description         Improve select streets between Overland and Victory, including Hollandale, K Bar T, and Targee, as a continuous bikeway as per the Southwest Boise Neighborhood Plan and the Bike Master Plan.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise, Meridian

Design Year                             2022-2023

Design Cost                             $55,000

Right-of-Way Year          2023

Right-of-Way Cost             $2,000

Construction Year           2024

Construction Cost           $380,000

Project Manager                Ryan Head

 

Project Name                        Linder-Meridian Bikeway, Pine Ave / Temple Dr

Project Description         Improve as a bikeway select streets between Linder Rd and Meridian Rd to include wayfinding, bikeway signage, enhanced crossings at Ustick and McMillan, and markings as per the Bike Master Plan.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Meridian

Design Year                             2023-2024

Design Cost                             $55,000

Right-of-Way Year          2024

Right-of-Way Cost             $2,000

Construction Year           2025

Construction Cost           $380,000

Project Manager                Ryan Head

 

Project Name                        Nez Perce St Bikeway, Orchard St / Columbus St

Project Description         Improve Nez Perce St as a low-stress bikeway to include wayfinding and bikeway signage, enhanced crossings, and markings as per the Bike Master Plan and the Central Bench Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise

Design Year                             2022

Design Cost                             $51,000

Right-of-Way Year          2023

Right-of-Way Cost             $4,000

Construction Year           2023

Construction Cost           $209,000

Project Manager                Cody Homan

 

Project Name                        Poplar St Bikeway, Milwaukee St / Orchard St

Project Description         Improve Poplar St (including Wesley and Plymouth) as a bikeway to include wayfinding, signage, crossing at Cole Rd, and markings as per the Bike Master Plan.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise

Design Year                             2025

Design Cost                             $50,000

Right-of-Way Year          Future

Right-of-Way Cost             $2,000

Construction Year           Future

Construction Cost           $202,000

Project Manager                Ryan Head

 

Project Name                        School Ave Bikeway, King Rd / Deer Flat Rd

Project Description         Improve School Ave as a bikeway to include wayfinding and bikeway signage and markings as per the Bike Master Plan.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Kuna

Design Year                             2023-2024

Design Cost                             $41,000

Right-of-Way Year          2024

Right-of-Way Cost             $2,000

Construction Year           2025

Construction Cost           $55,000

Project Manager                Ryan Head

 

Project Name                        Shoshone St Bikeway, Canal St / Capital Blvd

Project Description         Improve Shoshone St as a bikeway network to include wayfinding, bikeway signage, a mini roundabout, enhanced connections at Overland, and markings as per the Shoshone Bikeway Concept.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise

Design Year                             2018-2019

Design Cost                             $147,000

Right-of-Way Year          2019-2020

Right-of-Way Cost             $20,000

Construction Year           2020-2021

Construction Cost           $80,000

Project Manager                Seth Jarsky

 

Project Name                        Ustick-Northview Bikeway Connection, Shamrock Ave / Milwaukee St

Project Description         Enhance crossings and provide wayfinding and bikeway signage to provide a connection between low-stress bikeways.

Project Program                Community Programs

Project Sub-Program      Bikeways

City Location                        Boise

Design Year                             2025

Design Cost                             $50,000

Right-of-Way Year          Future

Right-of-Way Cost             $2,000

Construction Year           Future

Construction Cost           $202,000

Project Manager                Ryan Head

 

Core Community Projects

Project Name                        32nd St, US 20/26 (Chinden Blvd) / Clay St

Project Description         Construct curb, gutter, sidewalk, swales, landscaped bulb outs, and pedestrian scale illumination on 32nd from Chinden to Clay in partnership with Garden City and Garden City URA.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Garden City

Design Year                             2021

Design Cost                             $90,000

Right-of-Way Year          2022

Right-of-Way Cost             $19,000

Construction Year           2023

Construction Cost           $593,000

Project Manager                Jason Tugby

 

Project Name                        33rd St, US 20/26 (Chinden Blvd) / Greenbelt

Project Description         Construct curb, gutter, sidewalk, bulb outs, and bike facilities on 33rd St from Chinden Blvd to the Greenbelt.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Garden City

Design Year                             2024

Design Cost                             $183,000

Right-of-Way Year          2025

Right-of-Way Cost             $144,000

Construction Year           Future

Construction Cost           $715,000

Project Manager                Ricardo Calderon

 

Project Name                        35th St, US 20/26 (Chinden Blvd) / Greenbelt

Project Description         Construct curb, gutter, sidewalk, bulb outs, and bike facilities on 35th St from Chinden Blvd to the Greenbelt.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Garden City

Design Year                             2025

Design Cost                             $159,000

Right-of-Way Year          Future

Right-of-Way Cost             $176,000

Construction Year           Future

Construction Cost           $597,000

Project Manager                Ricardo Calderon

 

Project Name                        Allumbaugh St, Fairview Ave / Northview St

Project Description         Complete curb, gutter, and sidewalk on the west side of Allumbaugh St, between Fairview Ave and Northview St.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise

Design Year                             2022

Design Cost                             $135,000

Right-of-Way Year          2023

Right-of-Way Cost             $276,000

Construction Year           2024

Construction Cost           $667,000

Project Manager                Ricardo Calderon

 

Project Name                        Avenue B, 02nd St / Main St

Project Description         Construct curb, gutter, and sidewalk on both sides of Ave B, between 02nd St and Main St in accordance with the Kuna Downtown Corridor Plan.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Kuna

Design Year                             2025

Design Cost                             $36,000

Right-of-Way Year          Future

Right-of-Way Cost             $3,000

Construction Year           Future

Construction Cost           $119,000

Project Manager                Ricardo Calderon

 

Project Name                        Avenue C, Main St / 04th St

Project Description         Install curb, gutter, sidewalk, and angled parking on both sides of Avenue C from Main St to 04th St as per the Kuna Downtown Corridor Plan.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Kuna

Design Year                             2021

Design Cost                             $30,000

Right-of-Way Year          2021

Right-of-Way Cost             $4,000

Construction Year           2022

Construction Cost           $276,000

Project Manager                Seth Jarsky

 

Project Name                        Avenue D, Main St / 04th St

Project Description         Install curb, gutter, sidewalk, and angled parking on both sides of Avenue D from Main St to 04th St as per the Kuna Downtown Corridor Plan.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Kuna

Design Year                             2022

Design Cost                             $35,000

Right-of-Way Year          2022

Right-of-Way Cost             $4,000

Construction Year           2024

Construction Cost           $153,000

Project Manager                Seth Jarsky

 

Project Name                        Broadway Ave, West 08th St / West 04th St

Project Description         Construct sidewalk on the south side of Broadway, from West 07th to West 04th as per the Downtown Meridian Neighborhood Plan. Includes pedestrian railing on the back side of sidewalk where it crosses Nine Mile Creek.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Meridian

Design Year                             2023

Design Cost                             $113,000

Right-of-Way Year          2024

Right-of-Way Cost             $2,000

Construction Year           2025

Construction Cost           $447,000

Project Manager                Ricardo Calderon

 

Project Name                        Clay St, 34th St / 32nd St

Project Description         Construct curb, gutter, sidewalk, swales, landscaped bulb outs, and illumination on Clay from 34th to 32nd in partnership with Garden City and Garden City URA.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Garden City

Design Year                             2021

Design Cost                             $120,000

Right-of-Way Year          2022

Right-of-Way Cost             $13,000

Construction Year           2024

Construction Cost           $655,000

Project Manager                David Rader

 

Project Name                        Clay St, 37th St / 34th St; 34th St, Chinden Blvd / Clay St

Project Description         Construct curb, detached sidewalk, swales, landscaped bulb outs at intersections and illumination on Clay St, from 37th St to 34th St and on 34nd St, from Chinden Blvd to Clay St.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Garden City

Design Year                             2022

Design Cost                             $227,000

Right-of-Way Year          2023

Right-of-Way Cost             $124,000

Construction Year           2025

Construction Cost           $1,039,000

Project Manager                David Rader

 

Project Name                        Coston St, Bannock St / Franklin St

Project Description         Complete sidewalk on the west side of Coston, from Bannock to Franklin as per the East End Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise

Design Year                             2022

Design Cost                             $51,000

Right-of-Way Year          2022

Right-of-Way Cost             $4,000

Construction Year           2023

Construction Cost           $276,000

Project Manager                Brian McCarthy

 

Project Name                        Division Ave, Highland St / Hale St

Project Description         Construct curb, gutter and sidewalk on the east side of Division Avenue. 2020 Commission Directive Project.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise

Design Year                             2019-2020

Design Cost                             $40,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $253,000

Project Manager                Chris Dayley

 

Project Name                        East 03rd St, Franklin Rd / Carlton St

Project Description         Construct streetscape improvements, including curb, gutter, sidewalk, and improved UPRR crossing, from Franklin to Carlton as per the Downtown Meridian Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Meridian

Design Year                             2022

Design Cost                             $340,000

Right-of-Way Year          2023

Right-of-Way Cost             $287,000

Construction Year           2025

Construction Cost           $1,353,000

Project Manager                Ryan Cutler

 

Project Name                        East 2 1/2 St, Carlton Ave / Fairview Ave

Project Description         Construct sidewalk on the east side of East 2 1/2, from Carlton to Fairview as per the Downtown Meridian Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Meridian

Design Year                             2024

Design Cost                             $77,000

Right-of-Way Year          Future

Right-of-Way Cost             $74,000

Construction Year           Future

Construction Cost           $242,000

Project Manager                Ricardo Calderon

 

Project Name                        Five Mile Rd and Seneca Dr Pedestrian Crossing

Project Description         Install a pedestrian hybrid beacon (PHB) at Five Mile Rd and Seneca Dr.  Install ADA-compliant ramps as necessary.  2020 Commission Directive Project.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Ada County

Design Year                             2020

Design Cost                             $45,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2020

Construction Cost           $17,000

Project Manager                Jason Tugby

 

Project Name                        Five Mile Rd and Smoke Ranch Dr Pedestrian Crossing

Project Description         Install an enhanced pedestrian crossing at Five Mile Rd and Smoke Ranch Dr.  2020 Commission Directive Project.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise

Design Year                             2020

Design Cost                             $51,000

Right-of-Way Year          N/A

Right-of-Way Cost             $5,000

Construction Year           2021

Construction Cost           $294,000

Project Manager                Jason Tugby

 

Project Name                        Floating Feather Rd, Brandon Rd / Hornback Ave

Project Description         Construct sidewalk on the north side of Floating Feather Rd from Brandon Rd to Hornback Ave.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Star

Design Year                             2021

Design Cost                             $20,000

Right-of-Way Year          2022

Right-of-Way Cost             $48,000

Construction Year           2023

Construction Cost           $235,000

Project Manager                Jason Tugby

 

Project Name                        Horseshoe Bend Rd and Floating Feather Rd

Project Description         Construct curb ramps and sidewalk connections at Horseshoe Bend and Rd and Floating Feather Rd to improve pedestrian access and safety.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Eagle

Design Year                             2022

Design Cost                             $59,000

Right-of-Way Year          2022

Right-of-Way Cost             $3,000

Construction Year           2023

Construction Cost           $132,000

Project Manager                Joe Tate

 

Project Name                        Horseshoe Bend Rd and Shadowview St Pedestrian Crossing

Project Description         Install curb ramps, a striped pedestrian crossing, and refuge island on Horseshoe Bend Rd on the north side of Shadowview St. In-house design.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Eagle

Design Year                             2020

Design Cost                             $0

Right-of-Way Year          2020

Right-of-Way Cost             $1,000

Construction Year           2020

Construction Cost           $15,000

Project Manager                Jason Tugby

 

Project Name                        Horseshoe Bend Rd, State St / Hill Rd

Project Description         Construct a pathway on the east side of Horseshoe Bend Rd as per the NW Boise Neighborhood Plan. Includes precast bridge, pedestrian crossing (Utahna St), and bikeway signage.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise, Eagle

Design Year                             2021

Design Cost                             $125,000

Right-of-Way Year          2022

Right-of-Way Cost             $276,000

Construction Year           2023

Construction Cost           $653,000

Project Manager                Joe Tate

 

Project Name                        Liberty St Sidewalk and Bikeway, Douglas St / Denton St

Project Description         Complete sidewalk on the east side of Liberty St, between Douglas St and Denton St as per the Central Bench Neighborhood Plan. Install bikeway signage between Franklin Rd and Emerald St.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise

Design Year                             2022

Design Cost                             $35,000

Right-of-Way Year          2022

Right-of-Way Cost             $3,000

Construction Year           2023

Construction Cost           $483,000

Project Manager                Brian McCarthy

 

Project Name                        Linder Ave, Swan Falls Rd / 02nd St; Avalon St, Swan Falls Rd / Orchard Ave

Project Description         Construct pathway on the north side of Avalon St.  Project includes enhanced pedestrian crossing and curb ramps on Avalon St at Orchard.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Kuna

Design Year                             2025

Design Cost                             $117,000

Right-of-Way Year          Future

Right-of-Way Cost             $7,000

Construction Year           Future

Construction Cost           $392,000

Project Manager                Ricardo Calderon

 

Project Name                        Locust Grove Rd and Palermo Dr Pedestrian Crossing

Project Description         Install an enhanced pedestrian crossing (pedestrian hybrid beacon) across Locust Grove Rd at Palermo Dr.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Meridian

Design Year                             2022

Design Cost                             $71,000

Right-of-Way Year          2022

Right-of-Way Cost             $3,000

Construction Year           2023

Construction Cost           $334,000

Project Manager                Ryan Cutler

 

Project Name                        Locust Grove Rd and Woodbridge Dr Pedestrian Crossing

Project Description         Install an enhanced pedestrian crossing (pedestrian hybrid beacon) across Locust Grove, between Woodbridge and Watertower.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Meridian

Design Year                             2022

Design Cost                             $40,000

Right-of-Way Year          2022

Right-of-Way Cost             $3,000

Construction Year           2023

Construction Cost           $160,000

Project Manager                Chris Dayley

 

Project Name                        Main St and King St Pedestrian Crossing

Project Description         Install an enhanced pedestrian crossing (RRFB) across Main St at King St.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Meridian

Design Year                             2023

Design Cost                             $32,000

Right-of-Way Year          2024

Right-of-Way Cost             $2,000

Construction Year           2025

Construction Cost           $111,000

Project Manager                Ricardo Calderon

 

Project Name                        Maple Grove Rd and Edna St Pedestrian Crossing

Project Description         Install an enhanced pedestrian crossing (pedestrian hybrid beacon) across Maple Grove Rd at Edna St as per the West Bench Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise

Design Year                             2022

Design Cost                             $51,000

Right-of-Way Year          2023

Right-of-Way Cost             $11,000

Construction Year           2024

Construction Cost           $184,000

Project Manager                Joe Tate

 

Project Name                        McMillan Rd, Cortana Way / Goddard Creek way

Project Description         Construct pathway with extruded curb on the north side of McMillan between Cortana and Goddard Creek.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Meridian

Design Year                             2024

Design Cost                             $76,000

Right-of-Way Year          2025

Right-of-Way Cost             $87,000

Construction Year           Future

Construction Cost           $173,000

Project Manager                Ricardo Calderon

 

Project Name                        McMillan Rd, Westview Dr / Maple Grove Rd

Project Description         Complete sidewalk on the south side and a pathway on the north side from Westview to Maple Grove as per the West Bench Neighborhood Plan. Includes an enhanced crossing at Mitchell. In-house design.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise

Design Year                             2016

Design Cost                             $0

Right-of-Way Year          2017

Right-of-Way Cost             $0

Construction Year           2020

Construction Cost           $77,000

Project Manager                Seth Jarsky

 

Project Name                        Overland Rd and Phillippi St Pedestrian Crossing

Project Description         Install an enhanced crossing (pedestrian hybrid beacon) across Overland Rd at Phillippi St as per the Central Bench Neighborhood Plan. In-house design.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise

Design Year                             2020

Design Cost                             $44,000

Right-of-Way Year          2020

Right-of-Way Cost             $1,000

Construction Year           2021

Construction Cost           $265,000

Project Manager                Joe Tate

 

Project Name                        Phillippi St, Malad St / Targee St

Project Description         Complete curb, gutter and sidewalk from Malad to Targee as per the Central Bench Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise

Design Year                             2016

Design Cost                             $15,000

Right-of-Way Year          2017

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $504,000

Project Manager                Joe Tate

 

Project Name                        Phillippi St, Targee St / Overland Rd

Project Description         Construct curb, gutter, and sidewalk on the east side of Phillippi from Targee to Overland as per the Central Bench Neighborhood Plan. Includes partial road rehabilitation. In-house design.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise

Design Year                             2017

Design Cost                             $5,000

Right-of-Way Year          2019

Right-of-Way Cost             $24,000

Construction Year           2021

Construction Cost           $901,000

Project Manager                David Rader

 

Project Name                        Pine Ave and West 01st St Pedestrian Crossing

Project Description         Install an enhanced pedestrian crossing (rectangular rapid flashing beacon) on Pine Ave at West 01st St to improve access to Meridian Elementary School.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Meridian

Design Year                             2025

Design Cost                             $23,000

Right-of-Way Year          2025

Right-of-Way Cost             $2,000

Construction Year           Future

Construction Cost           $110,000

Project Manager                Ricardo Calderon

 

Project Name                        Roosevelt St, Rose Hill St / Emerald St

Project Description         Construct sidewalk on the west side of Roosevelt from Rose Hill to Emerald as per the Central Bench Neighborhood Plan. Project includes roadway rehabilitation.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise

Design Year                             2016

Design Cost                             $50,000

Right-of-Way Year          2017

Right-of-Way Cost             $20,000

Construction Year           2022

Construction Cost           $1,325,000

Project Manager                Brian McCarthy

 

Project Name                        Star Rd, Main St / SH 44 (State St)

Project Description         Construct sidewalk on the west side of Star Rd from Main St to SH 44 (State). Project includes the installation of an enhanced crossing at Star Rd and Main St.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Star

Design Year                             2025

Design Cost                             $182,000

Right-of-Way Year          Future

Right-of-Way Cost             $181,000

Construction Year           Future

Construction Cost           $793,000

Project Manager                Ricardo Calderon

 

Project Name                        Taft St, Sycamore Dr / 36th St

Project Description         Install curb, gutter and sidewalk on both sides of the roadway.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise

Design Year                             2025

Design Cost                             $513,000

Right-of-Way Year          Future

Right-of-Way Cost             $115,000

Construction Year           Future

Construction Cost           $1,525,000

Project Manager                Ricardo Calderon

 

Project Name                        US 20/26 (Chinden Blvd) and 43rd St Pedestrian Crossing

Project Description         Federal aid project to install an enhanced crossing on Chinden Blvd at 43rd St.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Garden City

Design Year                             2021

Design Cost                             $55,000

Right-of-Way Year          N/A

Right-of-Way Cost             $1,000

Construction Year           2023

Construction Cost           $165,000

Project Manager                Brian McCarthy

 

Project Name                        Victory Rd and Standing Timber Ave Pedestrian Crossing

Project Description         Install an enhanced crossing and curb ramps on Victory Rd at Standing Timber Ave.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Meridian

Design Year                             2018

Design Cost                             $5,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2020

Construction Cost           $17,000

Project Manager                Jason Tugby

 

Project Name                        Vista Ave and Nez Perce St Pedestrian Crossing

Project Description         Install an enhanced crossing on Vista at Nez Perce, including bike push buttons. Includes relocation of bus stops closer to Nez Perce from Spaulding in coordination with Valley Regional Transit.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Boise

Design Year                             2020

Design Cost                             $49,000

Right-of-Way Year          2020

Right-of-Way Cost             $1,000

Construction Year           2021

Construction Cost           $251,000

Project Manager                Chris Dayley

 

Project Name                        Western Heritage Byway (Swan Falls Rd), Initial Point / southern terminus

Project Description         Construct roadway shoulder along Swan Falls between Initial Point to the southern terminus of the roadway.

Project Program                Community Programs

Project Sub-Program      Core Community Projects

City Location                        Ada County

Design Year                             2022-2024

Design Cost                             $383,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024-2025

Construction Cost           $4,989,000

Project Manager                Ryan Cutler

 

Economic Development

Project Name                        05th St and 06th St, Myrtle St / Fort St, Two-Way Conversion

Project Description         Complete a 1-way to 2-way conversion of 05th St and 06th St in downtown Boise.

Project Program                Community Programs

Project Sub-Program      Economic Development

City Location                        Boise

Design Year                             2018-2019

Design Cost                             $40,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           Future

Construction Cost           $3,006,000

Project Manager                Cody Homan

 

Project Name                        05th St and Fort St and Hays St

Project Description         Improve intersection for pedestrians, bicyclists, and motorists. Project concept will determine the scope of intersection improvements.

Project Program                Community Programs

Project Sub-Program      Economic Development

City Location                        Boise

Design Year                             Future

Design Cost                             $175,000

Right-of-Way Year          Future

Right-of-Way Cost             $0

Construction Year           Future

Construction Cost           $0

Project Manager                Ricardo Calderon

 

Project Name                        Aikens St, Eagle Rd / 02nd St

Project Description         Extend Aikens St, east to 02nd St from its current terminus and complete the street section with curb, gutter, and sidewalk as per the Eagle Rd and State St Intersection Concept Study.

Project Program                Community Programs

Project Sub-Program      Economic Development

City Location                        Eagle

Design Year                             2018-2019

Design Cost                             $94,000

Right-of-Way Year          2019-2020

Right-of-Way Cost             $490,000

Construction Year           2023-2024

Construction Cost           $1,411,000

Project Manager                Cody Homan

 

Project Name                        Broadway Ave/Avenue B and Idaho St/Warm Springs Ave

Project Description         Modify intersection as per the Broadway Ave / Avenue B and Idaho St / Warm Springs Ave Concept Design. Donna Larsen Park Pathway and pedestrian crossings being completed under a separate project.

Project Program                Community Programs

Project Sub-Program      Economic Development

City Location                        Boise

Design Year                             Future

Design Cost                             $198,000

Right-of-Way Year          Future

Right-of-Way Cost             $801,000

Construction Year           Future

Construction Cost           $2,994,000

Project Manager                Ricardo Calderon

 

Project Name                        Pine Ave, Meridian Rd / Locust Grove Rd - Roadway

Project Description         Reconstruct roadway including intersection widening, curb, gutter, sidewalk and bike lanes in partnership with Meridian and the Meridian Development Corporation. Project includes Pine Bridge #1126. FY2020 funding will complete basin re-vegetation.

Project Program                Community Programs

Project Sub-Program      Economic Development

City Location                        Meridian

Design Year                             2016

Design Cost                             $28,000

Right-of-Way Year          2017

Right-of-Way Cost             $0

Construction Year           2018-2020

Construction Cost           $60,000

Project Manager                Cody Homan

 

Safe Sidewalks

Project Name                        Safe Sidewalk Program (2021)

Project Description         Repair existing damaged sidewalk, replace non-compliant curb ramps, and fill in small sidewalk gaps to high priority locations identified in ACHD's Americans with Disability Act Transition Plan. Project includes the area of Fairview Ave to Northview St, Allumbaugh St / Curtis Rd. In-house design.

Project Program                Community Programs

Project Sub-Program      Safe Sidewalks

City Location                        Boise

Design Year                             2020

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $1,600,000

Project Manager                Ryan Fisher

 

Project Name                        Safe Sidewalk Program (2022)

Project Description         Repair existing damaged sidewalk, replace non-compliant curb ramps, and fill in small sidewalk gaps to high priority locations identified in ACHD's Americans with Disability Act Transition Plan. Project includes the area of Edna St to McMillan Rd, Shamrock Ave / Five Mile Rd.

Project Program                Community Programs

Project Sub-Program      Safe Sidewalks

City Location                        Boise

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $1,600,000

Project Manager                Ryan Fisher

 

Project Name                        Safe Sidewalk Program (2023)

Project Description         Repair existing damaged sidewalk, replace non-compliant curb ramps, and fill in small sidewalk gaps to high priority locations identified in ACHD's Americans with Disability Act Transition Plan.

Project Program                Community Programs

Project Sub-Program      Safe Sidewalks

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $1,600,000

Project Manager                Ryan Fisher

 

Project Name                        Safe Sidewalk Program (2024)

Project Description         Repair existing damaged sidewalk, replace non-compliant curb ramps, and fill in small sidewalk gaps to high priority locations identified in ACHD's Americans with Disability Act Transition Plan.

Project Program                Community Programs

Project Sub-Program      Safe Sidewalks

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $1,600,000

Project Manager                Ryan Fisher

 

Project Name                        Safe Sidewalk Program (2025)

Project Description         Repair existing damaged sidewalk, replace non-compliant curb ramps, and fill in small sidewalk gaps to high priority locations identified in ACHD's Americans with Disability Act Transition Plan.

Project Program                Community Programs

Project Sub-Program      Safe Sidewalks

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $1,600,000

Project Manager                Ryan Fisher

 

Vehicle Registration Fee Projects

Project Name                        09th St and Washington St Pedestrian Crossing

Project Description         Install an enhanced pedestrian crossing (rectangular rapid flashing beacon) at 09th St and Washington St as per the North Boise Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2022

Design Cost                             $50,000

Right-of-Way Year          2022

Right-of-Way Cost             $1,000

Construction Year           2023

Construction Cost           $141,000

Project Manager                Chris Dayley

 

Project Name                        13th St Traffic Calming (Phase 1), Fort St / Hill Rd

Project Description         Implement components of the 13th St Traffic Calming Concept Study, including bulbouts at select intersections and an enhanced pedestrian crossing (rectangular rapid flashing beacon) of 13th St at Resseguie St.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2020-2021

Design Cost                             $44,000

Right-of-Way Year          N/A

Right-of-Way Cost             $1,000

Construction Year           2021-2022

Construction Cost           $719,000

Project Manager                Seth Jarsky

 

Project Name                        28th St, Hazel St / Irene St

Project Description         Construct bulb-outs at corners of the 28th St intersections of Irene St, Bella St, and Hazel St to provide traffic calming.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2019

Design Cost                             $4,000

Right-of-Way Year          2019

Right-of-Way Cost             $0

Construction Year           2020-2021

Construction Cost           $247,000

Project Manager                David Rader

 

Project Name                        38th St, Bush Ave / Sunset Ave

Project Description         Extend roadway and complete sidewalk on both sides of 38th St from Bush Ave to Sunset Ave. Due to roadway elevation differences, project will require reconstruction of portions of the roadway.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2019-2020

Design Cost                             $30,000

Right-of-Way Year          2020

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $369,000

Project Manager                Jason Tugby

 

Project Name                        Annett St, Malad St / Targee St

Project Description         Construct sidewalk on west side of Annett St from Malad St to Targee St as per the Central Bench Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             Future

Design Cost                             $110,000

Right-of-Way Year          Future

Right-of-Way Cost             $2,000

Construction Year           Future

Construction Cost           $511,000

Project Manager                Ricardo Calderon

 

Project Name                        Bogart Ln, SH 44 (State St) / Sloan St

Project Description         Construct an asphalt pathway with raised curb on the east side of Bogart from Pocono to Caswell and curb, gutter and sidewalk on the east side at Sloan as per the NW Boise Plan. In-house design.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2019-2020

Design Cost                             $9,000

Right-of-Way Year          2020

Right-of-Way Cost             $27,000

Construction Year           2021

Construction Cost           $252,000

Project Manager                Chris Dayley

 

Project Name                        Boise Ave and Linden St Pedestrian Crossing

Project Description         Install an enhanced crossing (rectangular rapid flashing beacon) on Boise Ave at Linden St as per the Southeast Boise Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2022

Design Cost                             $35,000

Right-of-Way Year          2022

Right-of-Way Cost             $5,000

Construction Year           2023

Construction Cost           $122,000

Project Manager                David Rader

 

Project Name                        Cassia St Bikeway and Pedestrian Improvements

Project Description         Improve Cassia St as a bikeway from Franklin to Kootenai and sidewalk from Franklin Park to Curtis and Latah to Shoshone. Includes pavement rehabilitation, raised intersection at Shoshone, pedestrian bridge at Cassia Park, and enhance pedestrian crossings.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2018-2019

Design Cost                             $397,000

Right-of-Way Year          2020

Right-of-Way Cost             $8,000

Construction Year           2021

Construction Cost           $3,486,000

Project Manager                Brian McCarthy

 

Project Name                        Cherry Ln and Meridian Library Pedestrian Crossing

Project Description         Install an enhanced crossing (pedestrian hybrid beacon) on Cherry Lane  between West 8th and Linder. This will require relocation of the existing school zone beacon to the west.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Meridian

Design Year                             2019

Design Cost                             $0

Right-of-Way Year          2019

Right-of-Way Cost             $9,000

Construction Year           2020

Construction Cost           $16,000

Project Manager                Jason Tugby

 

Project Name                        Christine St, Northview St / Ustick Rd

Project Description         Construct sidewalk on both sides of Christine, from Northview to Ustick as per the West Bench Neighborhood Plan. Includes roadway rehabilitation. In-house design.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2017

Design Cost                             $0

Right-of-Way Year          2018

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $1,014,000

Project Manager                Joe Tate

 

Project Name                        Clement St, Cabarton Ln / Mountain View Dr

Project Description         Complete sidewalk on Clement St from Cabarton Ln to Mountain View Dr in accordance with the West Bench Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2024

Design Cost                             $32,000

Right-of-Way Year          2024

Right-of-Way Cost             $2,000

Construction Year           2025

Construction Cost           $258,000

Project Manager                Ricardo Calderon

 

Project Name                        Cory Ln, Mitchell St / Maple Grove Rd

Project Description         Complete sidewalk on the north side of Cory Ln from Maple Grove Rd to Mitchell St as per the West Bench Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2021

Design Cost                             $46,000

Right-of-Way Year          2022

Right-of-Way Cost             $100,000

Construction Year           2023

Construction Cost           $195,000

Project Manager                Seth Jarsky

 

Project Name                        Deer Flat Rd and School Ave Pedestrian Crossing

Project Description         Install an enhanced pedestrian crossing (pedestrian hybrid beacon) on Deer Flat Rd at School Ave.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Kuna

Design Year                             2019

Design Cost                             $32,000

Right-of-Way Year          2019

Right-of-Way Cost             $1,000

Construction Year           2020-2021

Construction Cost           $16,000

Project Manager                Jason Tugby

 

Project Name                        Deer Flat Rd, School Ave / Deerhorn Ave

Project Description         Construct an asphalt pathway on the north side of Deer Flat from School Ave to Deerhorn Ave. Project includes asphalt path to the west near the Teed Lateral and sidewalk connection near Kuna High School.  2020 Commission Directive Projects.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Kuna

Design Year                             2020

Design Cost                             $26,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2020

Construction Cost           $16,000

Project Manager                Jason Tugby

 

Project Name                        Desert Ave, Latigo Dr / Round Up St

Project Description         Construct sidewalk within existing right-of-way on the south side of Desert Ave, between Latigo Dr and Round Up St.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Ada County

Design Year                             2023

Design Cost                             $24,000

Right-of-Way Year          2024

Right-of-Way Cost             $3,000

Construction Year           2025

Construction Cost           $208,000

Project Manager                Ricardo Calderon

 

Project Name                        Eagle Rd and Ranch Dr Pedestrian Crossing

Project Description         Install an enhanced pedestrian crossing at Eagle Rd and Ranch Dr.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Eagle

Design Year                             2025

Design Cost                             $25,000

Right-of-Way Year          Future

Right-of-Way Cost             $0

Construction Year           Future

Construction Cost           $121,000

Project Manager                Ricardo Calderon

 

Project Name                        Enhanced School Crossings - Meridian Middle School and Capital High School

Project Description         Install enhanced pedestrian crossings (rectangular rapid flashing beacons) on West 08th St in front of Meridian Middle School and on Milwaukee St next to Capital High School at the existing crosswalks.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise, Meridian

Design Year                             2020

Design Cost                             $24,000

Right-of-Way Year          2020

Right-of-Way Cost             $2,000

Construction Year           2021

Construction Cost           $173,000

Project Manager                Joe Tate

 

Project Name                        Five Mile Rd and La Grange St Pedestrian Crossing

Project Description         Install an enhanced crossing on Five Mile at La Grange. Install an asphalt pathway with extruded curb on the east side of Five Mile, south La Grange St and on the south side of La Grange.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Ada County

Design Year                             2021

Design Cost                             $60,000

Right-of-Way Year          2021

Right-of-Way Cost             $3,000

Construction Year           2022

Construction Cost           $397,000

Project Manager                Ryan Cutler

 

Project Name                        Franklin St, McKinley St / Pierce St

Project Description         Construct sidewalks on the north side of Franklin St, between McKinley St and Pierce St.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2019

Design Cost                             $91,000

Right-of-Way Year          2020

Right-of-Way Cost             $2,000

Construction Year           2021

Construction Cost           $256,000

Project Manager                Jason Tugby

 

Project Name                        Garden St, Bethel St / Emerald St

Project Description         Construct sidewalks on the both sides of Garden St, between Bethel St and Emerald St as per the Central Bench Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2023

Design Cost                             $242,000

Right-of-Way Year          2024

Right-of-Way Cost             $31,000

Construction Year           2025

Construction Cost           $1,168,000

Project Manager                Ricardo Calderon

 

Project Name                        Garden St, Franklin Rd / Bethel St

Project Description         Construct sidewalks on the both sides of Garden St, between Franklin Rd and Bethel St as per the Central Bench Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2019

Design Cost                             $175,000

Right-of-Way Year          2020

Right-of-Way Cost             $63,000

Construction Year           2022

Construction Cost           $803,000

Project Manager                Seth Jarsky

 

Project Name                        Hazel St, 28th St / 26th St

Project Description         Construct detached sidewalk on the south side of Hazel St, between 28th St and 26th St.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2018-2019

Design Cost                             $0

Right-of-Way Year          2019

Right-of-Way Cost             $0

Construction Year           2020-2021

Construction Cost           $34,000

Project Manager                David Rader

 

Project Name                        Hill Rd, Castle Dr / Outlook Ave

Project Description         Construct sidewalk on the east side of Hill between Castle and Outlook. Includes an enhanced crossing at Castle Dr and Cynthia Mann Elementary School.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2024

Design Cost                             $45,000

Right-of-Way Year          2025

Right-of-Way Cost             $97,000

Construction Year           Future

Construction Cost           $330,000

Project Manager                Ricardo Calderon

 

Project Name                        Irene St, 32nd St / 28th St

Project Description         Construct curb, gutter, and sidewalk on the south side of Irene between 32nd and 28th.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2023

Design Cost                             $101,000

Right-of-Way Year          2024

Right-of-Way Cost             $2,000

Construction Year           Future

Construction Cost           $346,000

Project Manager                Ricardo Calderon

 

Project Name                        Kootenai St Traffic Calming, Orchard St / Vista Ave

Project Description         Implement components of the Kootenai St Traffic Calming Concept Study. Project to be completed in phases.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2021

Design Cost                             $286,000

Right-of-Way Year          2021-2022

Right-of-Way Cost             $0

Construction Year           2023-2024

Construction Cost           $1,942,000

Project Manager                David Rader

 

Project Name                        Kuna Middle School Zone, Ten Mile Ave and Boise St

Project Description         Install school zone beacons on Ten Mile and Boise near Kuna Middle School. Includes lighting at Ten Mile and Sego Prairie.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Kuna

Design Year                             2021

Design Cost                             $0

Right-of-Way Year          2021

Right-of-Way Cost             $4,000

Construction Year           2022

Construction Cost           $158,000

Project Manager                Seth Jarsky

 

Project Name                        Linda Vista Ln, Cory Ln / Ustick Rd

Project Description         Construct curb, gutter and sidewalk on west side of Linda Vista Ln from Canterbury Dr to Ustick Rd. Priority project request from the Boise School District.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2023

Design Cost                             $113,000

Right-of-Way Year          2024

Right-of-Way Cost             $65,000

Construction Year           Future

Construction Cost           $760,000

Project Manager                Chris Dayley

 

Project Name                        Linder Rd, Main St / Deer Flat Rd

Project Description         Complete curb, gutter, sidewalk and a Level 3 bike facility on Linder Rd from 4th St to Deer Flat Rd. Project will construct an enhanced crossing at Porter St.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Kuna

Design Year                             2021-2022

Design Cost                             $265,000

Right-of-Way Year          2023

Right-of-Way Cost             $133,000

Construction Year           2024

Construction Cost           $1,472,000

Project Manager                Joe Tate

 

Project Name                        McMillan Rd, Red Horse Way / Locust Grove Rd

Project Description         Complete pathway on the north side of McMillan Road 380-feet west of the intersection of McMillan Rd and Locust Grove Rd to fill pedestrian gap.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Meridian

Design Year                             2024

Design Cost                             $50,000

Right-of-Way Year          2025

Right-of-Way Cost             $189,000

Construction Year           Future

Construction Cost           $109,000

Project Manager                Ricardo Calderon

 

Project Name                        Milwaukee St, Marcum St / Ustick Rd

Project Description         Install curb, gutter, and sidewalk on the west side of Milwaukee St from Marcum St to Ustick Rd. Sidewalk would be placed between the canal and the roadway.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2023

Design Cost                             $160,000

Right-of-Way Year          2024

Right-of-Way Cost             $33,000

Construction Year           2025

Construction Cost           $971,000

Project Manager                Ricardo Calderon

 

Project Name                        Phillippi St, Overland Rd / Cassia St

Project Description         Rebuild roadway to include a 7’ attached curb, gutter, and sidewalk on both sides of the road and install bikeway signage and markings. Rebuild roadway due to cross slope issues.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2023

Design Cost                             $110,000

Right-of-Way Year          2024

Right-of-Way Cost             $29,000

Construction Year           2025

Construction Cost           $1,289,000

Project Manager                Ricardo Calderon

 

Project Name                        Pierce St, Washington St / Shenandoah Dr

Project Description         Complete sidewalks on Pierce St from Washington to Shenandoah to improve pedestrian safety for students walking to Roosevelt Elementary. Includes road rehabilitation.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2019

Design Cost                             $0

Right-of-Way Year          2019

Right-of-Way Cost             $0

Construction Year           2020

Construction Cost           $27,000

Project Manager                Chris Dayley

 

Project Name                        Pollard Ln, Floating Feather Rd / Star Middle School

Project Description         Construct a 7' asphalt path on the west side of Pollard, between Floating Feather and Star Middle School and on Floating Feather, west of Pollard. Project includes a pedestrian bridge over the canal.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Star

Design Year                             2022

Design Cost                             $40,000

Right-of-Way Year          2022

Right-of-Way Cost             $32,000

Construction Year           2023

Construction Cost           $194,000

Project Manager                Chris Dayley

 

Project Name                        Roe St, Limelight St / Caswell St

Project Description         Install an asphalt path on the west side of Roe between Limelight and Caswell.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2025

Design Cost                             $24,000

Right-of-Way Year          Future

Right-of-Way Cost             $52,000

Construction Year           Future

Construction Cost           $42,000

Project Manager                Ricardo Calderon

 

Project Name                        Stoddard Rd, Victory Rd / Overland Rd

Project Description         Reconstruct Stoddard, between Victory and Overland to 3-lanes, sidewalks and bike lanes or multi-use paths. Project includes bridge #2085 and an enhanced crossing at Victory and Stoddard.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Meridian

Design Year                             2022

Design Cost                             $309,000

Right-of-Way Year          2023

Right-of-Way Cost             $149,000

Construction Year           2024

Construction Cost           $1,530,000

Project Manager                David Rader

 

Project Name                        Valley St, Lake Hazel Rd / La Grange St

Project Description         Complete curb, gutter, sidewalk, parking and bike facility on the west side of Valley St from Lake Hazel Rd to La Grange St.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Ada County

Design Year                             2019

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2020

Construction Cost           $15,000

Project Manager                Chris Dayley

 

Project Name                        Warm Springs Ave and Straughan Ave Pedestrian Crossing

Project Description         Install an enhance pedestrian crossing (rectangular rapid flashing beacon) on Warm Springs Ave at Straughan Ave as per the East End Neighborhood Plan.

Project Program                Community Programs

Project Sub-Program      Vehicle Registration Fee Projects

City Location                        Boise

Design Year                             2022

Design Cost                             $33,000

Right-of-Way Year          2022

Right-of-Way Cost             $3,000

Construction Year           2023

Construction Cost           $156,000

Project Manager                Seth Jarsky

 

Environmental Program

Project Name                        Green Stormwater Implementation (2019)

Project Description         Reconstruct two alleys in downtown Boise identified as part of ACHD's National Pollutant Discharge Elimination System (NPDES) permit compliance program. Alleys are located south of Bannock, 4th / 5th and east of 10th, Miller / Myrtle.

Project Program                Environmental Program            

City Location                        Boise

Design Year                             2018

Design Cost                             $31,000

Right-of-Way Year          N/A

Right-of-Way Cost             $2,000

Construction Year           2020-2021

Construction Cost           $40,000

Project Manager                David Rader

 

Project Name                        Green Stormwater Implementation (2022)

Project Description         Implement identified green stormwater infrastructure projects at select locations to be identified as part of ACHD's National Pollutant Discharge Elimination System (NPDES) permit compliance program.

Project Program                Environmental Program            

City Location                        To Be Determined

Design Year                             2021

Design Cost                             $50,000

Right-of-Way Year          N/A

Right-of-Way Cost             $11,000

Construction Year           2022

Construction Cost           $408,000

Project Manager                Joe Tate

 

Project Name                        Green Stormwater Implementation (2023)

Project Description         Implement identified green stormwater infrastructure projects at select locations to be identified as part of ACHD's National Pollutant Discharge Elimination System (NPDES) permit compliance program.

Project Program                Environmental Program            

City Location                        To Be Determined

Design Year                             2022

Design Cost                             $50,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $450,000

Project Manager                Seth Jarsky

 

Project Name                        Green Stormwater Implementation (2024)

Project Description         Implement identified green stormwater infrastructure projects at select locations to be identified as part of ACHD's National Pollutant Discharge Elimination System (NPDES) permit compliance program.

Project Program                Environmental Program            

City Location                        To Be Determined

Design Year                             2023

Design Cost                             $50,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $450,000

Project Manager                Erica Anderson-Maguire

 

Project Name                        Green Stormwater Implementation (2025)

Project Description         Implement identified green stormwater infrastructure projects at select locations to be identified as part of ACHD's National Pollutant Discharge Elimination System (NPDES) permit compliance program.

Project Program                Environmental Program            

City Location                        To Be Determined

Design Year                             2024

Design Cost                             $50,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $450,000

Project Manager                Erica Anderson-Maguire

 

Project Name                        Green Stormwater Implementation (2026)

Project Description         Implement identified green stormwater infrastructure projects at select locations to be identified as part of ACHD's National Pollutant Discharge Elimination System (NPDES) permit compliance program.

Project Program                Environmental Program            

City Location                        To Be Determined

Design Year                             2025

Design Cost                             $50,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2026

Construction Cost           $450,000

Project Manager                Erica Anderson-Maguire

 

Project Name                        Thurman Mill Bridge Projects Water Quality Mitigation

Project Description         Provide water quality and quantity mitigation for a series of bridge projects being reconstructed in or near the Thurman Mill drainage area.

Project Program                Environmental Program            

City Location                        Garden City

Design Year                             2020

Design Cost                             $33,000

Right-of-Way Year          2021

Right-of-Way Cost             $163,000

Construction Year           2022

Construction Cost           $52,000

Project Manager                Seth Jarsky

 

Project Name                        Whitewater Park Blvd Basin #1009

Project Description         Modify stormwater basin #1009 to improve drainage and water quality.

Project Program                Environmental Program            

City Location                        Boise

Design Year                             2020-2021

Design Cost                             $181,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           Future

Construction Cost           $0

Project Manager                Dyan Bevins

 

Traffic Safety and Operations Program

Operations and Maintenance

Project Name                        Arterial Dynamic Message Sign Installation

Project Description         Install arterial DMS signs on major commuter routes such a Chinden Blvd, State St and Fairview Ave to provide incident, construction and travel time information to drivers.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Operations and Maintenance

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $320,000

Project Manager                Shawn Martin

 

Project Name                        Fiber Optic Cable Network Update

Project Description         Replace existing ACHD fiber or add additional fiber in existing conduit to improve operation of the ACHD network.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Operations and Maintenance

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $100,000

Project Manager                Shawn Martin

 

Project Name                        Traffic Signals New and Upgraded (2021)

Project Description         Rebuild and upgrade selected traffic signals, including poles and mast arms, as well as detection and electrical systems.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Operations and Maintenance

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $600,000

Project Manager                Shawn Martin

 

Project Name                        Traffic Signals New and Upgraded (2022)

Project Description         Rebuild and upgrade selected traffic signals, including poles and mast arms, as well as detection and electrical systems.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Operations and Maintenance

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $600,000

Project Manager                Shawn Martin

 

Project Name                        Traffic Signals New and Upgraded (2023)

Project Description         Rebuild and upgrade selected traffic signals, including poles and mast arms, as well as detection and electrical systems.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Operations and Maintenance

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2023

Construction Cost           $300,000

Project Manager                Shawn Martin

 

Project Name                        Traffic Signals New and Upgraded (2024)

Project Description         Rebuild and upgrade selected traffic signals, including poles and mast arms, as well as detection and electrical systems.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Operations and Maintenance

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2024

Construction Cost           $300,000

Project Manager                Shawn Martin

 

Project Name                        Traffic Signals New and Upgraded (2025)

Project Description         Rebuild and upgrade selected traffic signals, including poles and mast arms, as well as detection and electrical systems.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Operations and Maintenance

City Location                        To Be Determined

Design Year                             N/A

Design Cost                             $0

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2025

Construction Cost           $300,000

Project Manager                Shawn Martin

 

Safety and Accessibility

Project Name                        Benjamin Ln and BVRR Crossing Improvement

Project Description         Install crossing signal, including constant warning detection, at the Boise Valley Railroad crossing of Benjamin Ln in Boise. Project to be design by the Idaho Department of Transportation in coordination with ACHD.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Safety and Accessibility

City Location                        Boise

Design Year                             2021

Design Cost                             $10,000

Right-of-Way Year          N/A

Right-of-Way Cost             $0

Construction Year           2022

Construction Cost           $310,000

Project Manager                Cody Homan

 

Project Name                        Fairview Ave and Curtis Rd Accessible Pedestrian Signal

Project Description         Replace pedestrian poles with Accessible Pedestrian Signal-compatible push buttons and replace pedestrian ramps with ADA compliant ramps.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Safety and Accessibility

City Location                        Boise

Design Year                             2020

Design Cost                             $30,000

Right-of-Way Year          2020

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $221,000

Project Manager                Jason Tugby

 

Project Name                        Fairview Ave and Milwaukee St Accessible Pedestrian Signal

Project Description         Replace pedestrian poles with Accessible Pedestrian Signals and replace pedestrian ramps with ADA compliant ramps. Includes radius flattening of the southwest corner to minimize existing curb damage.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Safety and Accessibility

City Location                        Boise

Design Year                             2020

Design Cost                             $29,000

Right-of-Way Year          2020

Right-of-Way Cost             $0

Construction Year           2021

Construction Cost           $149,000

Project Manager                Jason Tugby

 

Project Name                        Fairview Ave and Orchard St

Project Description         Replace pedestrian poles with Accessible Pedestrian Signal-compatible push buttons and replace pedestrian ramps with directional ramps. Project will also reduce the radius of the southwest corner.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Safety and Accessibility

City Location                        Boise

Design Year                             2021

Design Cost                             $53,000

Right-of-Way Year          2021

Right-of-Way Cost             $4,000

Construction Year           2022

Construction Cost           $464,000

Project Manager                Ryan Cutler

 

Project Name                        Orchard St and Clark St

Project Description         Install a left turn lane at the intersection of Orchard St and Clark St to enhance intersection safety.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Safety and Accessibility

City Location                        Boise

Design Year                             2022

Design Cost                             $103,000

Right-of-Way Year          2023

Right-of-Way Cost             $381,000

Construction Year           2024

Construction Cost           $714,000

Project Manager                Cody Homan

 

Project Name                        Orchard St and Franklin Rd Accessible Pedestrian Signal

Project Description         Install Accessible Pedestrian Signals at the Franklin Rd and Orchard St intersection to enhance accessibility in compliance with the Americans with Disabilities Act.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Safety and Accessibility

City Location                        Boise

Design Year                             2023

Design Cost                             $107,000

Right-of-Way Year          2024

Right-of-Way Cost             $42,000

Construction Year           2025

Construction Cost           $557,000

Project Manager                Seth Jarsky

 

Project Name                        Overland Rd and Vista Ave Intersection Maintenance and Safety Improvement

Project Description         Complete intersection maintenance, drainage improvement and remove free-running right turn lane. Requested for scoping by Design and Pavement Management.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Safety and Accessibility

City Location                        Boise

Design Year                             2021

Design Cost                             $40,000

Right-of-Way Year          Future

Right-of-Way Cost             $0

Construction Year           Future

Construction Cost           $0

Project Manager                Ricardo Calderon

 

Project Name                        Rose Hill St and Owyhee St Mini Roundabout

Project Description         Replace the current two-way stop controlled intersection with a mini-roundabout to enhance intersection safety.

Project Program                Traffic Safety and Operations Program  

Project Sub-Program      Safety and Accessibility

City Location                        Boise

Design Year                             2021-2022

Design Cost                             $100,000

Right-of-Way Year          2023

Right-of-Way Cost             $18,000

Construction Year           2024

Construction Cost           $277,000

Project Manager                Joe Tate